Laserfiche WebLink
c ��i <br /> • Date: 7 / 6� <br /> PUBLIC WORKS PERMIT <br /> Public Works Permit#: PW1607-049 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: C1606-025 <br /> Everett, WA 98201 Planning Reference#: SUB14-003 <br /> (425) 257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ALPINE HEIGHTS DEVELOPMENT STEVE SNYDER <br /> 120 SW EVERETT MALL WAY ST100 120 SW EVERETT MALL WAY <br /> EVERETT WA 98204 EVERETT WA 98204 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# SITE ADDRESS: 2017 79TH ST SE <br /> CONSTRUCT NEW TOWNHOUSE UNIT <br /> LOT 41 OF ALPINE HEIGHTS SUB14-003 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 w <br /> prior to starting construction and with other inspection requests. <br /> 6. A sprinkler system is required for this building in compliance with the requirements of [moi <br /> NFPA Standards 13D. <br /> 7. Install erosion control measures as determined by the Public Works Inspector, such <br /> as silt fence, straw bales, swales, or erosion blankets. <br /> 8. Connect side sewer per City Standard #'s 601 through 604. O <br /> 9. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 10.All excavated material from foundation, sidewalk, and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. 'Z <br /> 11. No building materials to be stacked on sidewalk/roadway and sidewalk/ro P ke0 <br /> be kept clean and open for pedestrian travel. <br /> 12. Driveway to Garage shall be paved. <br /> OCT 0 7 2016 � <br /> Public Works Fee Breakdown: O <br /> Plan Review$20.00 CITY OF EVERETT <br /> Inspection $20.00 A-I <br /> ��o��!�.„��+ �.2ip' �� Permit Services <br /> Driveway$25.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> / City of Everett from any and all claims for damages, costs,expenses,or <br /> causes of action that m arise because of installation and maintenance of the <br /> improvem n r other ri t-of-way use hereto applied for and further agrees to <br /> Ap roved for C nstruction Date removes upon not from e City and to replace public property <br /> damaged h eby. /„ <br /> FI L INSPECTI N Date lD 7 /v <br /> Approved as Constructed Sigirfature of Ap cant D to <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />