My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/11/18 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/11/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 3:09:14 PM
Creation date
11/30/2015 3:09:02 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/18/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 3 <br /> WHEREAS,this action also includes a change in zoning for the expansion area from B-2 <br /> (Corn-unity Business)and R-2(Single Family)to B-2-1(Institutional Overlay)and R-2-I <br /> (Institutional.Overlay),depicted in Exhibit B;and <br /> WHEREAS,the proposal is based on a Master Plan site revision submitted to the City by ECC <br /> that will extend the current Master Plan from 2011 to 2015,see Exhibit C,with a depiction at <br /> Exhibit showing how the Master Plan expansion area could appear after full buildout. <br /> . . .�-1 t+',F,EA_S,the Planning Commission held three opportunities for comment with public input • <br /> and hearings on November 27,2007,April 7,2008 and lime 2,2008,where public testimony <br /> was received along with College and City Planning staff presentations were various aspects of <br /> the proposal were considered; and - <br /> WHEREAS,EMC 19.33B.030 allows the institutional overlay zone to be established,only in • <br /> conjunction with a master plan which generally specifies the parameters for development of the • <br /> property; and <br /> WHEREAS,the Everett Zoning Code provides for zones which allow institutional uses such as <br /> proposed by ECC for the entire campus area,including the existing area and the expansion area,to <br /> develop in accordance With height, setback and other standards established through a public review <br /> process as well as s andards applicable in the underlying zone, as specified;and <br /> WHEREAS,following the June 2,.2008,public hearing the Planning Commission <br /> • recommended approval of the proposed map amendment,rezone and Master Plan revision with <br /> conditions that mitigate adverse impacts to the existing and anticipated land uses in the <br /> immediate vicinity of the campus; and <br /> -WHEREAS, City Council held a public hearing to consider the request at which time it took <br /> additional public testimony and heard presentations from staff and the applicant on August 20, <br /> 2008,after which the City Council made the final decisions as reflected by this Ordinance; and <br /> IHE EAS, CITY COUNCIL FINDS: <br /> 1. As a school ECC is identified in the Comprehensive Plan as an `essential public facility." <br /> The following Comprehensive Plan Objectives and Policies specifically apply to this proposal: <br /> Policy 2.11.4 Future expansion beyond the approved. 2011 development will require <br /> additional review by the City,which may consist of amendments to the Institutional Overlay <br /> zone and Comprehensive Plan amendments. ECC must work with the suuounding neighborhood <br /> residents in planning future expansions. The approved Everett Conmmni y College Master Plan <br /> • provides for expansion to-the east to North Broadway and the north along Tower Street. <br /> 2 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.