Laserfiche WebLink
INSP C ION REPORT <br /> D 9)W Permit:ate C ' <br /> Contractor: <br /> Owner: <br /> Site Address: <br /> o CS t <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BWLDING MECHANICAL PLUMBING <br /> ❑Temp Servicer FER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork `' Footing ❑Rougi In ❑Rough In <br /> ❑Slab/Conduit Foundation ❑Ceiling Grid E]Ceiling Grid <br /> F-1RoughIn Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Ina ❑Gas Pipe Final ❑HWT Final <br /> Sir(I <br /> OTHER OR CONSULT ION: — <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> F] OKFOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> i <br /> Inspector: Date: <br /> El(10/06) DA ABAR,INC. <br />