Laserfiche WebLink
v <br /> • <br /> MDESIGNuzFIELD REPORT <br /> _ 1-of-2 <br /> Project Name: 'Everett River Front-Simpson Report: 020 <br /> GeoDesign #: Polygon-127-03 Date: 1/03/2017 <br /> - -- -- _ <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather:Clear,20% <br /> } <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) ArrIVdl�DepartUre: 0915/1000 <br /> Distribution: __ <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, E.I.T. <br /> —__- <br /> m Site Plan(s) m Density Test Summary Signature: :—_ x/1 <br /> Attachments: _ <br /> --_ __. <br /> ❑ Installation Records ❑ Other Reviewed By: - <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg,was on-site part time at the request of John Feltner <br /> with Polygon to observe the foundation subgrade for Lots 168 and 169. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 168: <br /> Today, GeoDesign noted that surface water under the footing subgrade area had pooled and frozen since our last site visit. <br /> GeoDesign notified Superior Concrete and John Feltner with Polygon that the ground should allowed to thaw prior to the <br /> placement of concrete. <br /> Lot 169: <br /> Previously, GeoDesign noted pooled water and loose material in the southeast corner of Lot 169. Today, GeoDesign noted <br /> that the pooled water and loose soil had frozen. GeoDesign also noted that pooled water across the footing subgrade area <br /> had also frozen. <br /> GeoDesign notified the concrete contractor and John with Polygon that the ground should be allowed to the thaw and <br /> surficially loose and saturated material be removed from the base of the footing areas prior to the placement of concrete. <br /> A summary of our observations can be found in the attached Figure 1.John Feltner with Polygon was notified of our <br /> observations prior to our departure from the site. <br /> This report presents opinions farmed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to compty»th the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's empkryees <br /> or agents. Our firm is not responsible for site safety.This field report Is a DRAFT representation of our field ob tvatlons,testing,and preliminary recommendations.The report canonry be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the'Reviewed 6y"section. <br /> 10700 Meridian Avenue North,Suite 402 1 Seattle,WA 98133 1 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 1 253.203.0095 <br />