My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/09/13 Council Minutes
>
Council Minutes
>
2017/09/13 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2017 8:45:22 AM
Creation date
9/22/2017 8:45:21 AM
Metadata
Fields
Template:
Council Minutes
Date
9/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 13, 2017 <br /> DESIGN-BUILD CONTRACT — WATER FILTRATION PLANT EAST <br /> CLEARWELL ROOF REPLACEMENT <br /> Moved by Council Member Roberts, seconded by Council Member <br /> Franklin, to award the Design-Build contract for design and <br /> construction of the Water Filtration Plant East Clearwell Roof <br /> Replacement to T. Bailey, Inc., in the amount of $3,022,197.06 <br /> including Washington State sales tax. <br /> Roll was called with all council members voting yes. <br /> Motion carried. <br /> EXECUTIVE SESSION: <br /> The City Council meeting recessed for an executive session at 7:34 p.m., <br /> reconvened, and adjourned at 7:45 p.m. <br /> (11 ..4 , <br /> City lerk desig - <br /> Read and approved as printed. 7 <br /> Coun- it Preside <br /> i. <br /> 312 <br />
The URL can be used to link to this page
Your browser does not support the video tag.