Laserfiche WebLink
Sep. 15. 2016 7:42PM T—Mob i 1 e No. 0673 P. 1/1 <br /> COST ESTIMATE SHEET <br /> Public Works Department <br /> Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date 9 14 2016 <br /> Work Order # <br /> Service Order # <br /> Contact Person Mark Johnson Telephone # <br /> Requested By <br /> Property Owner (Name) Same as above <br /> Address: 2312 21't ST __ _ __ __City Everett Zip. 98201 <br /> Installation Location Same as above <br /> Installation type/description Remove and replace 2-8'x5'x4" sidewalk and 18'x5'x6" sidewalk = 3.5 yds <br /> Concrete. <br /> 15 yds Concrete @ $98.50 per yd = $344,75 <br /> The following estimate is based upon the Street Division work group providing all labor and equipment. <br /> Itemized Cast Estimate: <br /> Labor&Benefits 0 <br /> Material $344.75 <br /> Equipment Rental 0 <br /> Surface Restoration 0 <br /> Sales Tax 0 <br /> TATA! $344.75 <br /> Prepared by: K.C. McAuliffe Date Estimate Prepared: 9/1412016 <br /> Accepted by: presenting: <br /> ature) <br /> Please sign and return estimate to address above, Attn. Bob Sorgen <br /> ESTIMATE GOOD FOR M NTHS <br /> ii <br /> C:\U.erc\SSOAGEN\Document&\Svdewa3k ERtililAfB9\Z3: M <br />