Laserfiche WebLink
=� INSPECTION REPORT <br /> Date q In Permit: 01 I�© ✓ 3) <br /> Contractor: <br /> Owner: MWC) <br /> Site Address: en � �t <br /> TYPE OF INSP N REQUE <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER groundun work/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation '�'�IAechanical Final E]Medical Gas <br /> ❑Ceiling Grid E]Drywall Nailing ✓ ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid XGas <br /> efrigeration E]Rough in <br /> F-1Roofdrains E]Building Final Pipe Final E]HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMI <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Gcr7`— <br /> tem <br /> Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />