My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2306 WETMORE AVE 2017-09-25
>
Address Records
>
WETMORE AVE
>
2306
>
2306 WETMORE AVE 2017-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2017 8:46:42 AM
Creation date
9/25/2017 8:46:38 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2306
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS - Date 4/19/2007 � <br /> q U Public Works Permit# PW0709-010 <br /> PERMIT ��� � c�: <br /> Q��� , Building Permit# B0709-019 <br /> PUBLIC WORKS DEPARTMENT Planning Reference# <br /> 3200 Cedar <br /> / 2 Everett,WA 98201 Public Works Fee$ ' <br /> ��ltdG �Q0 <br /> 2�� (425)257.8810. <br /> �zz�c-{�� ��`,- � .r I app. C•� <br /> OWNER NAME APPLICANT NAME <br /> AND ADDRESS:.J0H 3v_;r1 C�"�f ANDADDRESG-.` <br /> 3209 COLBY AVE #105 <br /> EVERETT WA 98201 <br /> PHONE: ¢=22"" PHONE: <br /> TAX PARCELI.D.N PROJECTADDRESS: <br /> 0 0 9"�a 19 9..n�S►.3� n ,'Uf)-WF7ScaR.E-.A;X-R3►SC <br /> DESCRIPTION OF <br /> PROPOSEDWORK: NEW TRT-PLEY, <br /> PERMIT CONDITIONS LOT 30 & S 1/2 LOT 31, BLOCK 490, <br /> PLAT OF EVERETT <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed In accordance with this permit and current City of Everett Design and Construction <br /> Standards and Specifications. <br /> 3. Call Location Underground Service 48 hrs.before you dig.TOLL FREE NUMBER 1-800-424-5555 11 W <br /> ..r <br /> 4. Connect side sewer per City Standard 's 601, 602, 604. vi <br /> 5. Connect all rooftop downspouts to the side sewer. <br /> 6. The contractor must meet With the Public Works Inspector to discuss potential <br /> drainagF- routAng prior to beginning the project. O <br /> 7. Install erosion control measures as determined by the Puba <br /> Public Works inspector, u c h <br /> as silt fence, at.raw bales, J'-)ales, or erosion blankets. <br /> 8. Remove eronion control mea-cures upon completion of the project prior to final <br /> approval of the permit. Z <br /> 9. All excavated material frotr foundation, sidewalk and driveways shall be hauled t.c O <br /> an approved, pe, site. No wasting of material is allowed on this building ' at . <br /> lfi. Nn dirt, mud, rocks or debris to be tracked onto roadway. <br /> 11. No building materials to stacked on roadway and roadway to be kept clean and <br /> open for pedestr_an travel. <br /> 12. Adjust water meter box I" above sidewalk grade. 0 <br /> 1-3. Remove and replace curt), gutter and sidewalk as per City of Everett Standard Plan <br /> 01!: ?05A t, 306 on this proposal's frontage as directed by the Public Works Inspector a <br /> (i.e. all unused driveways and any broken or damaged ar.--� must- be replaced) . <br /> 14. Fav(� clrlvtwyy from the front property line out terthe bile', paving. <br /> 75. Itrst:.tilation of ,i new hydrant: is 'required for thi'a-�roject . Water Department will <br /> ,-io the 4*DLk 3t the developer's expense.i ' <br /> _"ttgi,1._- �u T_.-V5PEr-T-1*.%N{""-�,:,-R X-Wbl' AT 4 2 5-3 3 9-7403 ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> 'save harmless the City of Everett from any and all claims for <br /> - - �,demages,costs,expenses,or causes of action trial may apse <br /> I1 ovod for Construction ate "i'00 NS E}}because of installation and maintenance of the improvement or <br /> other right-ol-way use hereto applied for and lurcher agrees to <br /> i rrremovo same upon notice from the City and to replace public <br /> dam ed thor . <br /> FINAL INSPECT ION ��Approved as Constructed /•/ ag Z r pr <br /> Signature 01 Applicant Z Data <br /> WORK AUTHORIZED BY TRIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br /> TO COMPLETION,TI IIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> .. EPWP(7/0(3) d DATABAR.INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.