Laserfiche WebLink
INSPECTION REPORT <br /> Date:_I` lol Permit: UILDI-IV-7 <br /> Contractor: <br /> Owner: 9 LA VAC/ O <br /> Site Address _l_l U v v <br /> +yvl� *�/ � <br /> i Yi E OF INSPECTION REQUESTED <br /> VIKIECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding []Insulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> V <br /> AL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> T.C.O. ❑ CORRECTION REQUESTED ❑C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 1 <br /> A <br /> Inspector: Date: <br /> EIR(4/09) ) Xeric nir�$F�roRm'x PkRONu0Ilk)N'•425,/4111-11 <br />