Laserfiche WebLink
InspectionType Date Result Remarks <br /> 5827 S 2ND AVE LOT 1 <br /> Permit: C9805-032 Status: MICROFILMED Issued:N 6/10/98 Finaled: To Records: <br /> Description: NEW HOUSE <br /> Notes/Conditions: *12.18 CREDIT GIVEN FOR OVERPAYMENT OF PLAN CHECK <br /> BXW INSULATION SHIELD GAS VENT ATTIC. BLOCK RETURN AIR BELOW STAIRS.CALL FOR <br /> REINSPECTION. <br /> FRAMING 9/11/98 PART/CORR BUILDING <br /> TMB 1-PROIVDE TRUSS CLIPS PER PLAN. 2-OBTAIN MECH APPROVAL. 3-REINFORCE POINT LOAD @ <br /> GIRDER TRUSS. OK INSULATE. CALL FOR REINSPECTION. <br /> ROUGH-IN 9/11/98 CORR REQD MECHANICAL <br /> BXW INSULATION SHIELD GAS VENT ATTIC. BLOCK RETURN AIR BELOW STAIRS.CALL FOR <br /> REINSPECTION. <br /> DUCTWORK 9/15/98 APPROVAL MECHANICAL <br /> BXW ROUGH MECH CORRECTIONS OK. <br /> FRAMING 9/15/98 APPROVAL BUILDING <br /> TMB OK PER MECHANICAL INSPECTION APPROVAL. <br /> INSULATION 9/15/98 APPROVAL BUILDING <br /> TMB OK PER MECHANICAL INSPECTION APPROVAL. <br /> ROUGH-IN 9/15/98 APPROVAL MECHANICAL <br /> BXW ROUGH MECH CORRECTIONS OK. <br /> DRYWALL NAIL 9/30/98 APPROVAL BUILDING <br /> TMB <br /> GAS PIPING 10/1/98 OTHER MECHANICAL <br /> BXW X=L.P.GAS LINE. NOT READY. <br /> OTHER 10/1/98 OTHER MECHANICAL <br /> BXW X=L.P.GAS LINE. NOT READY. <br /> GAS PIPING 10/12/98 APPROVAL MECHANICAL <br /> BXW GAS LINE TESTED(60 LBS). (OUTSIDE LINE FROM HOUSE TO TANK.) OK FOR COVER. <br /> ROUGH-IN 10/12/98 APPROVAL MECHANICAL <br /> BXW GAS LINE TESTED(60 LBS). (OUTSIDE LINE FROM HOUSE TO TANK.) OK FOR COVER. <br /> FINAL 11/12/98 APPROVAL BUILDING <br /> TMB OK PER PLBG,ELEC,MECH FINALS. <br /> FINAL 11/12/98 APPROVAL MECHANICAL <br /> BXW APPROVAL AS NOTED. WOOD MANTLE OR TILE? FAX INFORMATION. <br /> FINAL 11/12/98 APPROVAL PLUMBING <br /> BXW ROUGH IN PLBG OK. <br /> S:\MMcleod\Crystal\lnfoRequests\PeterLandryPDR.rpt 10/24/2013 (_�Page <br />