Laserfiche WebLink
i <br /> t, INSPECTION REPORT <br /> Date -///"-hr Permit: <br /> Contractor: "S <br /> 4 [A Owner: -0—s-+h Ul <br /> Site Address: -�b( -'-1 t" F L S <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Nrounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> .Electrical Final ❑Shear Nailing GAS PIPE <br /> S E WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Finall ( <br /> Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: _1 �✓'_ __1—9 2-_6 Lo_�-- Lj_ <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED rjr <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: <br /> EIR(10/06) ATABA ,INC. <br />