Laserfiche WebLink
INSPECTION REPORT <br /> Date:@4 _ � Permit: O I- 07 <br /> Contractor: ) <br /> • �� Owner: <br /> Site Address: '1 OL-1 <br /> TYPE OF INSPECTION REQUESTED <br /> E AL BUILDING MECHANICAL PLUMBING <br /> ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Footing ❑ Rough In ❑ Rough In <br /> MaCond.it ❑Foundation ❑ Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER CONSULTATION: <br /> VAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> vL t F t £-2 -OL-0-CT- <br /> Inspector: Date: P <br /> EIR(4/09) ) 7nAzi=<T,. u iNs•azs/ann-avuu <br />