Laserfiche WebLink
INSPECTION REPORT <br /> j' 1W-- <br /> @47T <br /> Date: Permit: 1 � I <br /> MATT _ -- <br /> Contractor: � Y ATT _ <br /> Owner: w 2i 5 <br /> Site Address: 4LI 6-P <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> I:jl,,Geiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> Iectrical Final ❑Shear Nailing GAS PIPE <br /> IT WORK ❑Roof Nailing El Rough In/Service Hot Water Tank <br /> Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMI <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> r <br /> - -- C v <br /> Inspector: Date: <br /> EIR(4/09) 1...1 P....110N5•425/408-11900 <br />