Laserfiche WebLink
r.. <br /> INSPECTION REPORT <br /> —� Date �l ' Permit:'D� V <br /> Contractor: `� � <br /> Owner: - <br /> Site Address.',4,-O 2-1 S J <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ecvlce ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> Groundwork ❑Footing ❑Rough In ❑Rough In <br /> uit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHEB <br /> QONSULTATION: S <br /> [g-APPROV ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ F] F]OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> - - Fit-rf <br /> i <br /> Inspect Date: _ <br /> EIR(10/06) DATABAR.INC. <br />