Laserfiche WebLink
INSPECTION REPORT <br /> EY Date: �d T/Permit: <br /> Contractor: <br /> 04 'r <br /> Owner: <br /> Site Addre <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceil rid ❑Refrigeration ❑ Rough In <br /> ❑Roof drainswilding Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> R C,O)t, F-1VIOLATION ❑ <br /> !T0 <br /> PERFORM INSPECTION: <br /> WAVALL425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Q <br /> c 10 <br /> Inspector: P Date: IC2 _ ✓ 4 <br /> EIR(4/09) /C N/lTi=XE FORMS&PROMOTIONS 4:1/488-3900 <br />