My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9315 10TH AVE SE 2017-09-25
>
Address Records
>
10TH AVE SE
>
9315
>
9315 10TH AVE SE 2017-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2017 11:14:25 AM
Creation date
9/25/2017 11:14:22 AM
Metadata
Fields
Template:
Address Document
Street Name
10TH AVE SE
Street Number
9315
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• FOR OFFICE USE ONLY • PERMIT# <br /> BUILDING PLANNING <br /> Bldg/TI/Addn/Rem Size Zoning Classification <br /> Garage Size A< 1311 Sf!�% Overlay/Agreement <br /> VALUATION sem//� 5 Nonresidential Use <br /> Number of Stories Residential Use <br /> Occupancy Group Proposed No. of Dwelling Units: —� <br /> Occupant Load Total No. of Dwelling Units: ,—� <br /> Basement No A Yes Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes No 1/ <br /> Existing Sprinkler System? Yes No Unk Planning Inspector: <br /> Fire Sprinkler Required Yes No Phone#:— <br /> Reason Approvedaff Date: <br /> Existing Fire Alarm Yes No Unk Historic Approved by: Date: <br /> Fire Alarm Required Yes No School Mitigation Reqd? Yes No <br /> Reason Everett School Dist Mukilt ool Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes No #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes o Calculated ool Impact Fee: <br /> Architectural Approved: Date: // ` S of Impact Fee Credit: <br /> Structural Approved: Date: Total School Impact Fee Owed: <br /> Comments: Zia/S– 112-& Comments: <br /> Intake OK by: <br /> Intake OK by: Date: <br /> PUBLICWORKS <br /> FEES INTAKE: Checked By; Date: <br /> Plan Check Fee Comments: <br /> Building Permit <br /> Surcharge High Hazard Sites(Dental,Medical,Animals, Mortuary,etc-Review for RPBA) <br /> Additional Plan Check Public Works/Sys Dev/Traffic Mit./RPBA- NOT REQUIRED <br /> Plumbing Fee ❑ Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee ❑ Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: lj: <br /> Water Fee ❑ PW Permit Approved- PW <br /> Sewer Fee ❑ ee PW Review Worksheet <br /> Systems Dev. Fee PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee FIRE DEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes No Existing Bldg._ <br /> Update/New Detection Yes No Existing Bldg._ <br /> Update/New Chemical Yes No Existing Bldg. <br /> Update/New Fire Service Yes No Existing Bldg. <br /> Approved by: Date: <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.