|
2.2.REVIEW RECORDS OF THE EXISTING 5.2.3.3. RECOMMENDED SYSTEM DYNAMIC OF THIS PARAGRAPH. LOSS-ON-IGNITION ORGANIC MATTER THE LAWN ESTABLISHMENT PERIOD SHALL LEAST 2 WORKING DAYS ADVANCE NOTICE
<br /> UNDERGROUND UTILITIES. CALL UTILITY LOCATION (WORKING) PRESSURE (PSI) METHOD. NATIVE SITE TOPSOIL SHALL BE BEGIN UPON ACCEPTANCE BY THE OF DOING SUCH CORRECTIVE WORK.
<br /> SERVICE (800) 424-5555 FOR UTILITY LOCATION. AMENDED WITH FINE COMPOST MATERIAL OWNER'S REPRESENTATIVE BASED UPON ACCEPTANCE OF LAWN PLANTING AS
<br /> 6. RECORD DRAWINGS: SOIL AND SUBGRADE PREPARATION32 91 00
<br /> AVOID DAMAGE TO THESE FACILITIES AND SHALL ( ):- AS DESCRIBED ABOVE, IF MORE ORGANIC BOTH A UNIFORM STAND OF GRASS AND SPECIFIED HEREIN SHALL BE BASED ON A
<br /> RESTORE ALL DAMAGED UTILITIES AT 6.1.KEEP A CURRENT SET OF DRAWINGS WITH ALL CONTENT IS NEEDED TO MEET THESE UPON COMPLETION OF A FIRST MOWING. HEALTHY, FULL, VIGOROUSLY GROWING,
<br /> CONTRACTOR'S EXPENSE. AS-BUILT CHANGES OR ACTUAL CONDITIONS AS 1• SUBMITTALS: ORGANIC MATTER REQUIREMENTS. LAWN ESTABLISHMENT SHALL EXTEND FOR AND WELL-MANICURED STAND OF GRASS
<br /> WORK PROCEEDS, TO BE SUBMITTED FOR A MINIMUM OF 90 DAYS DURING THE AT THE END OF THE LAWN
<br /> 1.1. PROVIDE SUBMITTALS FOR FINE COMPOST IN 7. CONTRACTOR RESPONSIBLE FOR ACCOMMODATING
<br /> 3. SUBMITTALS APPROVAL AT COMPLETION T" IRRIGATION SYSTEM ESTABLISHMENT PERIOD. AREAS THAT
<br /> ACCORDANCE WITH THE REQUIREMENTS OF WSDOT ANY FLUFF FACTOR OR SETTLING. ACTIVE GROWING SEASON (DEFINED AS
<br /> 3.1.SHOP DRAWINGS: SUBMIT SHOP DRAWINGS OF INSTALLATION. THE "AS-BUILT" PLANS SHALL CONSECUTIVE DAYS FROM APRIL 30TH TO ARE BARE, HAVE A POOR STAND OF
<br /> .BRIDGE OCTOBER 30TH) DURING THE LAWN
<br /> IRRIGATION DESIGN PACKAGE PER NOTE 5 HEREIN CONSIST OF RED-LINED CORRECTIONS, NOTES, STANDARD SPECIFICATIONS FOR ROAD, GRASS, ARE DEAD OR DYING, HAVE
<br /> PRIOR TO BEGIN OF DEMOLITION AND WITHIN 2 COMMENTS, ETC. ON A CLEAN BOND PAPER AND MUNICIPAL CONSTRUCTION, LATEST EDITION, HYDROSEEDING (32 92 00): ESTABLISHMENT PERIOD, THE CONTRACTOR WEEDS, OR HAVE A SPOTTY OR
<br /> WEEKS FROM NOTICE TO PROCEED TO ENGINEER COPY. SHOW ALL CRITICAL DIMENSIONS. SECTION 9.14.4(8). SHALL ENSURE THE CONTINUING HEALTHY NON-UNIFORM GRADE THROUGH ANY
<br /> FOR REVIEW AND APPROVAL. 7. MAINTENANCE AND OPERATIONS ) MANUAL M&0 1.2. PROVIDE SOIL SUBMITTALS OF A CERTIFIED 1. SUBMITTALS: GROWTH OF THE LAWN. CAUSE SHALL BE REMEDIED BY
<br /> (
<br /> 3.2.POINT OF CONNECTION PRESSURE TEST: TEST LABORATORY ANALYSIS FROM AN ACCREDITED REGRADING, REMOVING AND RESEEDING
<br /> WATER PRESSURE AT EXISTING POINT OF 7.1.PREPARE A COMPLETE MAINTENANCE AND SOILS TESTING LABORATORY INDICATING THE 1.1. PROVIDE PRODUCT DATA ON SPECIFIED SEED MIX. 5.10.3. ADEQUATE AND PROPER CARE SHALL OR RESODDING, REFERTIUZING, REMOWING,
<br /> OPERATIONS (M&0) MANUAL AND SUBMIT THREE MATERIAL SOURCE AND COMPLIANCE WITH ALL 2. HYDROSEEDING SHALL BE INSTALLED PER WSDOT INCLUDE THE LABOR, MATERIALS, AND AND REWATERING, AS APPROPRIATE.
<br /> CONNECTION FOR HYDRAULIC CALCULATIONS. COPIES AT FINAL INSPECTION. THE MANUALS EQUIPMENT NECESSARY TO KEEP
<br /> 3.3.PRODUCT DATA: SUBMIT PRODUCT DATA 2 WEEKS SPECIFICATIONS FOR APPROVAL PRIOR TO STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND 5.10.3.6.APPROXIMATELY 10 DAYS BEFORE THE
<br /> INSTALLED LAWN IN A PRESENTABLE
<br /> CONSIST O THREE RING BINDERS CONTAINING: DELIVERY TO THE PROJECT SITE. SAMPLE SIZE MUNICIPAL CONSTRUCTION, LATEST EDITION, END OF THE LAWN ESTABLISHMENT
<br /> PRIOR TO START OF IRRIGATION WORK. INCLUDE CONDITION INCLUDING, BUT NOT LIMITED
<br /> (1) CATALOGS TS ALL MATERIALS USED, (2) A SHALL BE A MINIMUM OF 2 POUNDS. SECTION 8-02 PERIOD, THE CONTRACTOR SHALL
<br /> MANUFACTURER'S PRODUCT LITERATURE FOR ALL COMPLETE PARTS LIST OF ALL MATERIALS, 3 A TO, WATERING, MOWING, TRIMMING, REQUEST A FINAL INSPECTION FOR
<br /> PRODUCTS TO BE INSTALLED ON THIS SYSTEM. ( ) 1.3. 3. SEED FOR LAWNS SHALL BE AS FOLLOWS: CUTTING WITH AN ACCEPTABLE MULCH
<br /> WRITTEN SUMMARY OF ALL OPERATIONS DATA ACCEPTANCE OF THE ESTABLISHED LAWN.
<br /> 3.4.RECORD DOCUMENTS: RECORD AND SUBMIT INCLUDING SPRING START-UP AND WINTERIZATION
<br /> 2. COMPLETE SOIL AND SUBGRADE PREPARATION PER 3.1.SUNMARK LAWN BLOOMERS MIX AS SUPPLIED BY MOWER, LITTER AND DEBRIS REMOVAL,
<br /> 'AS-BUILT' INFORMATION ON IRRIGATION SYSTEM. TECHNIQUES, CONTROLLER PROGRAMMING, VALVE CONTRACT DOCUMENTS. SUNMARK SEEDS INTERNATIONAL, INC. EDGING, FERTILIZATION, WEED CONTROL, CONDITIONS FOUND UNACCEPTABLE BY
<br /> 3.5.MAINTENANCE AND OPERATIONS (M&U) MANUAL CLEANING, IRRIGATION ADJUSTMENTS, BACKFLOW 3. ALL PLANTING AREAS INCLUDING HYDROSEEDED 888-214-7333, OR APPROVED EQUAL REPAIR AND RESEEDING DAMAGED AREAS, THE OWNER'S REPRESENTATIVE SHALL BE
<br /> PREVENTER OPERATION AND ANY OTHER LAWNS AND REPAIR AREAS, SHALL RECEIVE 2.5" 3.2.INSTALL AT A RATE OF 1 LB PER 1000 SF. AND REPAIRING AND KEEPING IN CORRECTED BY THE CONTRACTOR WITHIN
<br /> 4. SYSTEM REQUIREMENTS INFORMATION REQUIRED TO OPERATE AND COMPOST PER WSDOT SECTION 8-02, RIPPED AND OPERATION IRRIGATION SYSTEMS INSTALLED 5 WORKING DAYS OF SUCH NOTICE.
<br /> BE
<br /> 4.1.DESIGN SYSTEM TO TARGET EACH PLANTING AREA MAINTAIN SYSTEM, AND TWO LOCAL DISTRIBUTORS. MIXED TO A DEPTH OF AT LEAST 8'. 4. SEEDING, FERTILIZING AND MULCHING SHALL AS PART OF THE WORK. AS A PART OF WHEN SUCH CORRECTION IS REQUIRED,
<br /> WITH NO OVERSPRAY ON IMPERVIOUS SURFACES PERFORMED DURING THE ALLOWABLE TIME FRAMES LAWN ESTABLISHMENT, THE CONTRACTOR THE LAWN ESTABUSHMENT PERIOD SHALL
<br /> 8. FIELD TESTING 4. SEE DETAILS FOR PLANTING SOIL DEPTHS. APRIL 1 TO MAY 31 OR SEPTEMBER 1 TO Ste: EXTEND AN ADDITIONAL 45 DAYS.
<br /> OR ADJACENT PLANTING AREAS. AVOID RUNOFF8.1.REQUEST OWNER'S REP ATTENDANCE AT EACH 5. ALL AREAS IMPACTED BY CONSTRUCTION ACTIVITY OCTOBER 15. WRITTEN PERMISSION FROM THE 5.10.3.1.SUBMITTAL: THE CONTRACTOR SHALL
<br /> OF WATER FROM THE SITE. TEST. GIVE A MINIMUM OF ONE-WEEK PRIOR OF ANY KIND, INCLUDING STORAGE OF MATERIALS, OWNER'S REPRESENTATIVE REQUIRED FOR SEEDING SUBMIT AT LEAST 5 WORKING DAYS IN
<br /> 4.2.DO NOT EXCEED MANUFACTURER'S SPRINKLER NOTICE. SHALL RECEIVE FULL REPAIR TO ORIGINAL OUTSIDE THE SEEDING SEASON. ADVANCE, THE PROPOSED WATERING AND
<br /> SPACING REQUIREMENTS. 8.2.MAINLINE PRESSURE TESTING: CONDITIONS. 5. HYDROSEEDED AREA INSTALLATION SHALL PROCEED MOWING SCHEDULES TO THE OWNER'S
<br /> 4.3.DESIGN SYSTEM SO THAT SPRINKLERS OPERATE6. SOIL FOR HYDROSEEDED AREAS: THROUGH THE FOLLOWING SEQUENCE OF STEPS IN REPRESENTATIVE. THE SUBMITTAL SHALL
<br /> WITHIN MANUFACTURER-RECOMMENDED OPERATING ITS CONSTRUCTION AND SHALL BE COORDINATED
<br /> 8.2.1. LEAVE ALL SYSTEM JOINTS, CONNECTIONS, ALSO IDENTIFY THE TYPE OF MOWER
<br /> PRESSURE.
<br /> ETC. EXPOSED UNTIL AFTER COMPLETION 6.1.SOIL SHALL CONSIST OF 75% SAND OR LOAMY WITH IRRIGATION SYSTEM CONSTRUCTION WHEN EQUIPMENT TO BE USED.
<br /> AND ACCEPTANCE OF THE PRESSURE SAND AND 25% FINE COMPOST BY VOLUME.
<br /> APPLICABLE:
<br /> 4.4.PRODUCTS: MATCH EXISTING PRODUCT FOR TEST. 5.10.3.2.MOW AND EDGE TO LIMIT THE HEIGHT OF
<br /> 6.2.SAND USED SHALL MEET THE FOLLOWING: LAWN TO 3 INCHES. THE CUTTING HEIGHT
<br /> IRRIGATION SYSTEM. ENSURE ALL NOZZLES ARE 5.1.PERFORM SUBGRADE PREPARATION AND INSTALL
<br /> 8.2.2. MAINLINE SHALL BE SUBJECTED TOA 6.2.1. SCREEN SIZE PERCENT PASSING SOIL AS REQUIRED IN SECTION 32 91 00 AND
<br /> MATCHED PRECIPITATION RATE (+/-5%) WITHIN A STATIC PRESSURE TEST OF 150 PSI. TO SHALL BE 3 INCHES WITH ALL CUTTINGS
<br /> ZONE. BE VALID ALL TESTS MUST BE 3/8 100 CONTRACT DOCUMENT DETAILS INCLUDING THE RETAINED USING MULCHING MOWER
<br /> 4.5.SELECT MAIN AND LATERAL PIPE SIZES SO THAT PERFORMED UNDER THE DIRECTION AND #20 77 - 100 ADDITION OF ANY AMENDMENT AND APPLICATION EQUIPMENT. SLOPES EXCEEDING 4:1
<br /> THE VELOCITY OF WATER MOVING THROUGH THE SUPERVISION OF OWNER'S REP. OF LIME REQUIRED. SHALL NOT BE MOWN.
<br /> 60 0 - 23
<br /> IRRIGATION PIPE DOES NOT EXCEED STATE AND5.2.RAKE TO REMOVE AND DISPOSE OF ALL LARGE 5.10.3.3.A TURF FERTILIZER WITH ORGANIC
<br /> 8.2.3. ATTACH TEST COMPRESSOR WITH FERTILIZER, OR A SLOW-RELEASE FORM
<br /> LOCAL REQUIREMENTS, OR THE INDUSTRY X200 0 - 10 CLODS, ROCKS, DEBRIS AND UTTER LARGER THAN
<br /> PRESSURE GAUGE TO HEAD OF MAINUNE. OF NITROGEN SHALL BE APPLIED AT THE
<br /> STANDARD OF 5 FPS, WHICHEVER IS LOWER. 1 INCH IN ANY DIMENSION.
<br /> 8.2.4. ATTACH GATE VALVE TO OPPOSITE END OF 6.2.2. SAND SHALL HAVE A TE RANGE OF 5.0
<br /> 5. IRRIGATION DESIGN PACKAGE - 6.5. SOILS INDICATED HAVING A PH 5.3.ROLL THE AREA IN 2 DIRECTIONS, THE SECOND END OF THE LAWN ESTABLISHMENT
<br /> MAINLINE. BELOW 5.0 SHALL BE TREATED WITH ROLLING AT RIGHT ANGLES TO THE FIRST. THE PERIOD AT THE RATE OF APPLICATION
<br /> 5.1.THE GRAPHIC PRESENTATION OF THE
<br /> DIAGRAMMATIC DESIGN SHALL INCLUDE CLEAR AND 8,2,5. OPEN GATE VALVE AND INSTALL DOLOMITIC LIMESTONE AS NECESSARY TO ROLLER SHALL BE OF A STANDARD, WATERFILLED AND FORMULATION RECOMMENDED BY
<br /> CONCISE REPRODUCIBLE DRAWINGS WITH ALL PRESSURE GAUGE, THEN REOPEN VALVE. ATTAIN THIS PH RANGE. SOILS HAVING A TYPE TO APPLY 150 TO 300 LBS PER SQUARE SOIL TESTING AGENCY. FOLLOWING
<br /> COMPONENTS SIZED, SYMBOLIZED AND KEYED IN 8.2.6. APPLY 150 PSI TO MAINLINE, TEST IS PH GREATER THAN 6.5 SHALL BE FOOT GROUND PRESSURE. FERTILIZER APPLICATION, THE LAWN SHALL
<br /> A DISTINCTIVE MANNER. DRAWINGS ARE TO BE AT FOR ONE HOUR. MAXIMUM ALLOWABLE TREATED WITH SULFUR AS NECESSARY TO 5.4.THE FINISHED GRADE SHALL MEET THE VERTICAL BE THOROUGHLY WATERED WITH AT LEAST
<br /> A SUITABLE SCALE TO BE CLEAR AND LEGIBLE, DROP IS 5 PSI IN ONE HOURS ATTAIN THIS PH RANGE. THE PH SHALL CLEARANCE REQUIREMENTS ADJACENT TO A 1 INCH DEPTH OF WATER.
<br /> AND HAVE A NORTH ARROW AND SCALE BAR. 9. PERFORMANCE TEST BE DETERMINED BY SOIL TEST. IMPROVEMENTS AS SPECIFIED IN THE CONTRACT 5.10.3.4.WATERING SHALL BE ACCOMPLISHED EACH
<br /> 5.2.PROVIDE A COMPLETE IRRIGATION DESIGN 9.1.REQUEST OWNER'S REP ATTENDANCE AT THE CONTRACTOR SHALL AMEND AND FERTILIZE PLANS AND DETAILS. WEEK FROM MARCH THROUGH SEPTEMBER.
<br /> PACKAGE, TO INCLUDE THE FOLLOWING: SOIL PER SOIL TESTING LABORATORY 5.5.FERTILIZER SHALL BE APPLIED AS REQUIRED IN WHEN WATER APPLICATION IS ,BY
<br /> THEN
<br /> SYSTEM COVERAGE TEST. GIVE A MINIMUM OF RECOMMENDATIONS. SECTION 32 91 00. COVERAGE SHALL BE AUTOMATIC IRRIGATION SYSTEM,
<br /> 5.2.1. SITE SPECIFIC INFORMATION: ONE-WEEK PRIOR NOTICE. 6.2.3. ORGANIC MATTER SHALL CONSIST OF FINE FAIRLY UNIFORM AND ALL AREAS SHALL BE WATERING SHALL BE DONE BETWEEN THE
<br /> 5.2.1.1. SITE MAP, THAT INCLUDES NORTH 9.2.SYSTEM PERFORMANCE DEMONSTRATION: COMPOST AS DESCRIBED ABOVE. COVERED. CONTRACTOR OPTION TO COMBINE HOURS OF 2:00 AM AND 5:00 AM. AT A
<br /> SYMBOL, TOPOGRAPHY, BUILDING AND KEY 9,2,1, UPON COMPLETION OF THE SYSTEM 6.2.4. SOIL SHALL NOT CONTAIN ANY VIABLE WITH HYDROSEEDING. MINIMUM, A UNIFORM APPLICATION OF 1
<br /> ELEVATIONS INSTALLATION, INCLUDING PUMP AND SEEDS OR ROOTS CAPABLE OF 5.6.APPLY THE SEED MIX BY HYDROSEEDING. INCH OF WATER SHALL A REQUIRED
<br /> EA
<br /> OVER ALL LAWN AREAS E
<br /> 5.2.1.2. STATIC PRESSURE (PSI) AT POINT OF CONTROLLER INSTALLATION AND HOOK-UP, SPROUTING OF ANY STATE-LISTED CH WEEK
<br /> 5.7.WATER THE AREA AS REQUIRED TO ESTABLISH. UNLESS RAINFALL PROVIDES MINIMUM
<br /> CONNECTION, FROM PRESSURE TEST AND AFTER THE FLUSHING AND PRESSURE NOXIOUS WEED OR INVASIVE
<br /> TESTS ARE COMPLETED, PERFORM A ROOT-PROPAGATING PLANTS INCLUDING 5.8.INSTALL TEMPORARY FLAGGING AND WARNING AMOUNT. THE CONTRACTOR SHALL BE
<br /> 5.2.1.3. REFERENCE TO LOCATION INFORMATION PREPARED TO WATER MORE FREQUENTLY
<br /> SYSTEM COVERAGE TEST FOR EACH ZONE BUT NOT LIMITED TO HORSETAIL, NY, SIGNS TO PREVENT THE PUBLIC FROM
<br /> REGARDING LOCATION OF SUBSURFACE SHOULD VERY DRY CONDITIONS PERSIST.
<br /> a UTILITIES. IN THE PRESENCE OF THE OWNER'S REP CLEMATIS, KNOTWEED, ETC. SOIL FOUND DISTURBING AND DAMAGING NEWLY INSTALLED
<br /> AND OWNER'S MAINTENANCE PERSONNEL TO CONTAIN THESE PROHIBITED VIABLE HYDROSEEDED AREAS. 5.10.3.5.LAWN AREAS WILL BE INSPECTED BY THE
<br /> M1 5.2.2. IDENTIFICATION AND LOCATION OF PLANT MATERIALS SHALL BE REMOVED 5.9.THE HYDROSEEDING ESTABLISHMENT PERIOD OWNER'S REPRESENTATIVE DURING THE
<br /> a 9.2.2. REPAIR ANY CLOGGED OR DAMAGED
<br /> N IRRIGATION COMPONENTS. INCLUDING NOZZLES. CORRECT ALL DEFICIENCIES, AND REPLACED AT THE CONTRACTOR'S SHALL FOLLOW THE OWNER'S REPRESENTATIVE'S LAWN ESTABLISHMENT PERIOD, SHOULD
<br /> MANUFACTURER, MODEL, TYPE AND SIZE. WITHOUT ADDITIONAL COST, UNTIL THE EXPENSE. ACCEPTANCE OF THE NEWLY INSTALLED THE OWNER'S REPRESENTATIVE DETERMINE
<br /> of 5.2.2.1. EXISTING IRRIGATION SYSTEM COMPONENTS HYDROSEEDING AREAS. UPON ACCEPTANCE ALL AT ANY TIME THAT THE CONTRACTOR IS
<br /> � TO REMAIN. OWNER'S REP APPROVES THE SYSTEM. 6.3.ALTERNATIVE SOIL FOR HYDROSEEDING: TEMPORARY FLAGGING AND WARNING SIGNS SHALL NOT PROVIDING ADEQUATE AND PROPER APPROVED
<br /> a 9.2.3. SYSTEM SHALL BE TESTED FOR BOTH STOCKPILED SOIL PREPARED TO MEET THE BE REMOVED. CARE OF THE LAWN OR IS PERFORMING
<br /> 0 5.2.2.2. SLEEVING UNDER NEW PAVEMENT FOLLOWING REQUIRMENTS:
<br /> MANUAL AND FULLY AUTOMATIC 5.10. THE HYDROSEEDING ESTABUSHMENT PERIOD UNACCEPTABLE LAWN ESTABLISHMENT PUSLI WORKS DE` T iv I
<br /> 5.2.2.3. STATION/ZONE VALVES OPERATION. 6.3.1. THE FINAL TOPSOIL SHALL HAVE AN WORK, THE OWNER'S REPRESENTATIVE 'AlA
<br /> o ORGANIC MATTER CONTENT BY DRY SHALL BE FOR ONE YEAR. BY
<br /> N 5.2.2.4. HEAD LAYOUT 9.3.MAINTENANCE TRAINING: UPON ACCEPTANCE OF WILL PROVIDE WRITTEN NOTICE TO THE
<br /> WEIGHT OF 5% FOR AREAS WHERE 5.10.1. LAWN ESTABLISHMENT WORK SHALL BE
<br /> 0 5.2.3. BASIC HYDRAULICS (PRESSURE LOSS THE SYSTEM H THE OWNER'S REPRESENTATIVE, CONTRACTOR TO CORRECT AND REMEDY
<br /> HYDROSEED WILL BE INSTALLED. ORGANIC PERFORMED BY PERSONNEL QUALIFIED IN
<br /> CALCULATIONS) FOR EACH ZONE. FURNISH O THE OWNER'S PERSONNEL KEYS AND MATTER SHALL BE DETERMINED BY AND EXPERIENCED WITH, SUSTAINABLE SUCH UNACCEPTABLE WORK E PRACTICE. DATE
<br /> OTHER TOOLS NECESSARY TO OPERATE, AND THE CONTRACTOR SHALL MAKE THE
<br /> 5.2.3.1. STATE WATER PRESSURE (PSI) AT POINT MAINTAIN THE SYSTEM. FURNISH SUFFICIENT LOSS-ON-IGNITION TEST. ACCEPTABLE TURF MANAGEMENT PRACTICES. NECESSARY CORRECTIONS WITHIN 5 CITY OF EVERETT REVIEWED FOR PERMIT
<br /> m OF CONNECTION TRAINING TO THE OWNER'S PERSONNEL IN THE TESTS INCLUDE THE MOST CURRENT 5.10.2. LAWN ESTABLISHMENT SHALL CONSIST OF WORKING DAYS OF THE DATE OF THE
<br /> i
<br /> 5.2.3.2. PRESSURE LOSS THROUGH ALL SYSTEM OPERATION MAINTENANCE, AND WINTERIZATION OF VERSION OF ASTM D2974 TEST METHODS PROVIDING ADEQUATE AND PROPER CARE WRITTEN NOTICE AND SHALL PROVIDE AT
<br /> COMPONENTS LISTED ABOVE, INCLUDING FOR MOISTURE, ASH, AND ORGANIC FOR ALL HYDROSEEDED AREAS INSTALLED
<br /> y THE SYSTEM. THE CONTRACTOR SHALL BE MATTER OF PEAT AND OTHER ORGANIC
<br /> o POINT Of CONNECTION, EXISTING MAINLINE LIABLE FOR ALL DAMAGES OR LOSSES RESULTING WITHIN THE LIMITS OF THE PROJECT.
<br /> AND LATERAL LINE PIPING FROM FAILURE TO COMPLY WITH THE PROVISIONSSOILS, AND TMECC 05.07A IF SHEET IS LESS THAN 22x34
<br /> a REDUCE SCALES ACCORDINGLY
<br /> i
<br /> � PROJECT ENGINEER: SCALE:
<br /> CASCADE ad�a E. SCHMIDT NO SCALE PORT OF EVERETT DWG.
<br /> u0. L3.03
<br /> Port of DESIGN DE.GSCHBY DATE
<br /> MIDT FEB. 19, 2016 WATERFRONT PLACE CENTRAL
<br /> COLLABORATIVE DRAWN BY: CHECKED INTERIM PUBLIC ACCESS 6-8-001-02
<br /> `o
<br /> EVERETT LANDSCAPE ARCHITECTLRE+URBAN DESIGN D. ROBBEN J. KLEINKOPF JETTY LANDING IMPROVEMENTS10PA-BL-2016-02P.O. BOX 538 PA-BL-2016-02
<br /> -C
<br /> o EVERETT, WA 98206 1402 3'm Ave.,Suite 415,Seattle,WA 98101 0 2/19/16 ISSUED FOR BSD & CONSTR,;CT'.^�u � APPROVED BY:
<br /> (425) 259-3164 (206 628-4133
<br /> n SPECIFICATION NOTES )1
<br /> / cescadadasl 8ncollab.com N0. DATE BY REVSION NODATE BY RIBISION SHED VO. 7 CF
<br /> '. .
<br />
|