My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9624 18TH AVE W 2019-01-11
>
Address Records
>
18TH AVE W
>
9624
>
9624 18TH AVE W 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:58:14 PM
Creation date
9/25/2017 1:45:55 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9624
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 19 16 12: 59p Mobile Home Parts Nwest 350-416-6630 p. 2 <br /> Vinyl Ski rfing Installation Instructions • Page:4 of y <br /> • <br /> Step C-P'anelltrstuilation <br /> 11.Begni mmg 24"away from the lowest corner of the home,measure from the I <br /> i�round up to 1 1/2"above the bottom edge of the back rail.(If temperature is <br /> low 40 degrees F,with frozen wotard,mea. to 3"above the beck tail <br /> edge-) , <br /> 2. Mcasurements on spring ground should be taken.every 16"(.width of <br /> panel), <br /> 3.C ut the hottorri of each pastel W single with the ground.Each cut panel 1 <br /> action should aligns 90 degrees to the bottom edge of the home.Use aviation <br /> srups or a_oowcr sLw(with a Brae toothed saw blade turned backwards)for + <br /> cutting. <br /> t.Using a Snap Lock Punch Too(,punch lock tabs every 4"along the top and E <br /> ttom edge of cut panel sections.Tabs are to be positioned outward to catch f <br /> on the Nx,ked edge of the rails. `- <br /> InterlcM:k panels and insert into the bottom rail.Begin with the first panel <br /> nserted issto the bottom rail.Lock tabs should snap past the hooked edge of <br /> he bottom rail-Insen next panel section into the interlock hooks along the <br /> •erbcal edge of the pastels. Seat each panel secicely into the bottom rail <br /> ERepeat interlocking panek,forming about a 12 R section.Resume panel cut <br /> and interlock method.Nets:To install around corners,refer to s2 E. <br /> Step D-Inberiock Top Fr jut bail With Top l3aaek Rail <br /> 1. Start snappusg one end of the front top rail into thew back top rail,creating <br /> e interlock.Push the front top rail upward,its entire length until the front <br /> Lop rail is completely interlocktxl with the back rail. <br /> 2.Overlap 1 inch each top rail section.Note: To install around corners,refer <br /> D <br /> step E <br /> Step.E-Corner Installation <br /> 1. Top Back-Rail:lvlake a 1 inch vertical slit from the top.Top interlock hook — <br /> Ldd be completely, cut thio ugh.Nowh 45 degroes on bottom cwved leg. <br /> 2.Bottom Rail:Notch the back portion v nth snips,as illustrated.Bead around <br /> corner and attach to the ground. <br /> 3.Panels:Cut pard to proper he.ght.Determine point of corner bend;bend l <br /> ver a table edge,fonning a uniform jangle. <br /> .Top Front Pail:Notch at both ilue top and bottom hooks of the front rail as <br /> llustrated.Bend around the carni arrd fit into the interlock with the top back i r <br /> .Rete;to step D.Note Prc-notched top front,rails may be included. <br /> I <br /> I� <br /> http://rn obilehomepartsstore.com/viny J_skirting_installati on.ht ml 5/19/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.