Laserfiche WebLink
Meg Haley <br /> From: Daniel K. Baek <dkbaek@uilarchitects.com> <br /> Sent: Tuesday, May 16, 2017 3:11 PM <br /> To: Meg Haley <br /> Cc: Daniel K. Baek; pnw Teriyaki <br /> Subject: Re:ALTERATIONS TO EXTG RETAIL STORE-76 STATION <br /> Attachments: UA17005-PNW Teriyaki-Permit Set-REV#1-20170516.pdf <br /> Meg <br /> Attached is the Revision#1 permit set for your review. <br /> Please see following summary of changes for Revision#1 <br /> 1. Keep (2) existing restrooms <br /> 2. Mop sink location changes -by the existing water heater(#23 @ A132) <br /> 3. Metal cabinet(chemical storage) location changes - by the ssts worktable (#18 @ A132) <br /> Followings are overall summary of work scope <br /> 1. architectural <br /> o new counter top @ service area with new sushi case <br /> 2. plumbing- separate permit <br /> o relocate (1) mop sink <br /> o install new(2) hand sinks <br /> o remove (1)hand sink <br /> o remove (1) existing 2-compartment sink and install (2) 1-compartment sinks <br /> 3. mechanical - separate permit <br /> o install new walk-in cooler <br /> Please let me know if you have any questions or concerns. <br /> Regards, <br /> 1�1o Daniel K. Baek, AIA, NCARB <br /> Principal <br /> UIL ARCHITECTS <br /> 1800 136th PL NE Suite 207, Bellevue WA 98005 <br /> CELL 425.635.8914 1 WORK 425.654.5005 1 voiP 070.7883.8299 <br /> dkbaek .uilarchitects.com <br /> ........................................................................ <br /> ........................................................................ <br /> 1/,� <br />