Laserfiche WebLink
• <br /> The determination of value or valuation under any of the <br /> provisions of this Code shall be made by the Building <br /> Official. The value to be used in computing the building <br /> permit and building plan review fees shall be the total value <br /> of all construction work for which the permit is issued as well <br /> as all finish work, painting, roofing, electrical, plumbing, <br /> heating, air conditioning, elevators, fire-extinguishing <br /> systems and any other permanent equipment. <br /> and inserting in its place: <br /> Section 304(b) Permits and Inspection Fees. The fee for each <br /> building or inspection shall be paid to the Building Official <br /> as set forth hereafter and in Table No. 3-A. <br /> The determination of value or valuation under any of the <br /> provisions of this Code shall be made by the Building <br /> Official. The value to be used in computing the building <br /> permit and building plan review fees shall be the total value <br /> of all construction work for which the permit is issued as well <br /> as all finish work, painting, roofing, electrical, plumbing, <br /> heating, air conditioning, elevators, fire-extinguishing <br /> systems and any other permanent equipment. The reference <br /> document to be used in determining the valuation for the <br /> purposes of fee calculation is the current building valuation <br /> data as published by the International Conference of Building <br /> Officials. <br /> 1. Temporary Structures. The fee for temporary structures, <br /> such as mobile homes, commercial coaches, prefabricated <br /> structures, modular structures, shall be $55.00. <br /> 2. Combination Fees. When all permits, including building <br /> (as set forth in Section 303(a)) , plumbing and mechanical <br /> are issued on the same permit, then the plumbing and <br /> mechanical permit fees shall be waived and when the <br /> plumbing and mechanical permits are issued on the same <br /> permit, the plumbing and mechanical may be waived. <br /> However, equipment and fixture fees shall be paid as set <br /> forth by Ordinance. <br /> 3. Alternate Fees. When a building, plumbing or mechanical <br /> permit is issued separately, the permit fee for each, <br /> together with all equipment and fixture fees, shall be <br /> paid as set forth by Ordinance. <br />