My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1720-90
>
Ordinances
>
Ordinance 1720-90
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 11:44:11 AM
Creation date
9/28/2017 11:44:10 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1720-90
Date
8/22/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 1 . Allocate $29 , 325 for street and sidewalk improvement <br /> project . <br /> a . Maple Street - 16th to 17th $29 , 325 <br /> Construct new curbs , gutters , sidewalks , and <br /> drainage on both sides of the street north of <br /> the alley and repair existing curbs on west <br /> side of the street south of the alley . ( This <br /> project is eligible for street overlay funds . ) <br /> B. Port Gardner Neighborhood Improvements <br /> 1 . Allocate $10, 000 to purchase play equipment for <br /> Doyle ' s Park . ( This project is not eligible for <br /> street overlay funds . ) <br /> C. Riverside Neighborhood Improvements <br /> 1 . Allocate $30, 715 for street and sidewalk improvement <br /> project. <br /> a . State Street - 19th to 20th $30, 715 <br /> Construct new sidewalks behind existing curbs <br /> on both sides of the street . ( This project is <br /> eligible for street overlay funds . ) <br /> Section 3 : Should costs be less for the above projects <br /> than originally estimated, projects receiving the next highest <br /> neighborhood priority shall be included for funding . If <br /> project costs exceed the estimates given , the lowest priority <br /> project or projects will be dropped for funding . <br /> Section 4 : If any of the above projects is started but not <br /> completed , completion of the project( s ) will be automatically <br /> funded with any 1991 Block Grant funds received by the <br /> neighborhood where an uncompleted project is located . <br /> Section 5 : All of the above projects shall conform to the <br /> requirements of the City Ordinance 555-78 , as amended by City <br /> Ordinances 665-80 and 793-81 . Determination of the <br /> appropriate standards to impose shall be made by the City <br /> Engineer . <br /> Section 6 : The total estimated cost of the improvements <br /> herein authorized is $70, 040 which will include all costs <br /> related to design , construction , contract administration , plan <br /> development and associated costs . <br /> Section 7 : The City Engineer of the City of Everett under <br /> the administration of the Mayor is hereby given the <br /> responsibility of providing for the street, sidewalk and <br /> drainage improvements as defined herein . <br />
The URL can be used to link to this page
Your browser does not support the video tag.