Laserfiche WebLink
• <br /> Section 5: The sum $2,785,531 is hereby appropriated to Fund 391, <br /> "Hewitt, Oakes, and Lombard Bridge Replacements" as follows: <br /> A. ESTIMATED PROJECT COSTS: <br /> 1. Hewitt Avenue Bridge, Program 924 <br /> Preliminary Engineering Phase (W.O. #1685) $ 152,482 <br /> Railroad Flagging (W.O. #2110) 22,364 <br /> Construction Phase (W.O. #2100) 1,431,033 <br /> TOTAL ESTIMATED COST: $1,605,879 <br /> 2. Oakes Avenue Bridge, Program 925 <br /> Preliminary Engineering Phase (W.O. #1687) $ 90,813 <br /> Railroad Flagging (W.O. #2111) 23,780 <br /> Construction Phase (W.O. #2102) 560,677 <br /> TOTAL ESTIMATED COST: $ 675,270 <br /> 3. Lombard Avenue Bridge, Program 926 <br /> Preliminary Engineering Phase (W.O. #1645) $ 69,967 <br /> Railroad Flagging (W.O. #2112) 11,643 <br /> Construction Phase (W.O. #2104) 422,772 <br /> TOTAL ESTIMATED COST: $ 504,382 <br /> TOTAL ESTIMATED PROJECT COST: $2,785,531 <br /> * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * <br /> B. SOURCE OF FUNDS <br /> 1. Hewitt Avenue Bridge <br /> a. Program 924, Preliminary Engineering Phase (W.O. #1685) <br /> Bridge Replacement Fund (Fed.) $116,852 <br /> Burlington Northern Railroad 29,213 <br /> 1/2 Cent Gas Tax 6,417 <br /> SUBTOTAL: $ 152,482 <br /> -7- <br />