My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sazan Group 8/15/2017
>
Contracts
>
6 Years Then Destroy
>
2019
>
Sazan Group 8/15/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:26:07 AM
Creation date
9/29/2017 10:25:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sazan Group
Approval Date
8/15/2017
Council Approval Date
8/9/2017
End Date
12/31/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Replacement of WFP Emergency Generators
Public Works WO Number
WO3587
Tracking Number
0000829
Total Compensation
$853,580.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> July 14, 2017 <br /> City of Everett, Public Works—Water Treatment Plant,Emergency Generator Replacement <br /> Fee Proposal—Professional Architectural and Engineering Services <br /> 2. Review utility as-built records to assist in mapping utility lines provided by the <br /> client and the local utility providers. <br /> 3. Establish a project network of inter-visible horizontal control points tied to <br /> existing site control network sufficient for the topographic and future <br /> construction of the project. <br /> 4. The survey will be on NAVD88 vertical datum and match existing on site <br /> control. <br /> 5. Provide a topographic survey of the site plus 75-100 feet outside of the project <br /> area and other key utilities and buildings near the project site as directed by <br /> engineering team. <br /> 6. Transfer field data to AutoCAD Civil 3D system and prepare base mapping with <br /> a contour interval of one foot which reflects the topographic and physical <br /> information collected. A copy of field data system will be provided in AutoCAD <br /> to two-dimensional format as requested. <br /> 7. Surface features: overhead power lines and marked underground utility lines, <br /> ground-level exterior building corners, vaults, power poles, walkways, retaining <br /> walls, signs, paths, and parking areas. <br /> E. Geotechnical Engineering: <br /> 1. It is anticipated that existing geotechnical reports developed for this facility will be <br /> available for use in this work. <br /> 2. Services will include one 80ft-deep boring to evaluate subsurface conditions at the <br /> location of proposed new generator pads and control building. <br /> 3. Laboratory testing will be performed to develop recommendations for design and <br /> construction of foundations for the planned improvements. <br /> 4. The results of the explorations,tests, analysis, and recommendations will be <br /> presented in a geotechnical report. <br /> F. Mechanical Engineering: <br /> 1. Heating, ventilating, and exhaust system design, in compliance with minimum <br /> requirements of IBC, IMC, UPC,WAC, State of Washington Energy Code. <br /> 2. Plumbing: Plumbing design, cold water, building drainage systems,and roof <br /> drainage system. <br /> 3. Generator set fuel storage, piping,fuel polishing and pumping system,with leak <br />
The URL can be used to link to this page
Your browser does not support the video tag.