My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
>
Contracts
>
Capital Contract
>
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:44 AM
Creation date
9/29/2017 10:34:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing & Masonry Restoration
Approval Date
8/15/2017
Council Approval Date
8/9/2017
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Police HQ Masonry Cleaning & Repair
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0000250
Total Compensation
$10,480.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing 8/23/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Project: Police HQ—Masonry Cleaning and Repair <br /> Change Order No. Two <br /> Change Order Effective Date: Date of Mayor's Signature <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> / <br /> k ._. A i„ ...„,„. <br /> M.;jar City Cler ity Atto <br /> Date: 8114 'aper Date: s ` e: • / / <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Date: Date: Date: Dait1144.1m6'7.1/2,,,// <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.