My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10819 AIRPORT RD 2021-02-17
>
Address Records
>
AIRPORT RD
>
10819
>
10819 AIRPORT RD 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 7:57:30 AM
Creation date
10/3/2017 8:03:33 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
10819
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> PUBLIC NORKS PERMIT Date: 1/8/2016 <br /> Public Works Permit#: PW1601-007 <br /> City of Everett Public Works Department <br /> r , <br /> 3200 Cedar Street Parent Permit#: <br /> Everett, WA 98201 <br /> (425) 257-8810 Planning Reference#: <br /> Public Works Fee$: $ 602.75 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> RRW INVESTMENTS LLC WIGHT REGGIE <br /> PO BOX 2868 10819 AIRPORT RD <br /> EVERETT WA 98213 EVERETT WA 98204 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00537900000400 SITE ADDRESS: 10819 AIRPORT RD <br /> CONSTRUCT NEW PARKING LOT-PIONEER CABLE <br /> PAINE FIELD 2 BLK 000 D-00 - LOT 4 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 =1 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works C-4 <br /> Department dated 03/14/2016. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappertat 425-339-7404 rn 7 Cow <br /> C7r'l <br /> prior to starting construction and with other inspection requests. <br /> 6. Install erosion control measures per City of Everett Standards and remove upon r; 7C, <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto <br /> roadway. <br /> 10. All work shall be performed in accordance with the City of Everett's current Design <br /> and Construction Standards and Specifications for Development. <br /> C•.J,�C77••LCr Ti <br /> Public Works Permit Fee Breakdown: LTI `A, cy e'O <br /> � <br /> Parking Lot Paving(SQFT) .....$45.00 � <br /> Erosion Control Plans-CommerciaVlndus.....$200.00 <br /> PW Plan Review.......................................$119.25 O <br /> PW Site Inspection....................................$238.50 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> r� causes of action that may arise because of installation and maintenance of the <br /> d for Constru o Date improvement or other right-of-way use hereto applied for and further agrees to <br /> p C( remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.