My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1110 BROADWAY 2020-01-21
>
Address Records
>
BROADWAY
>
1110
>
1110 BROADWAY 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 1:40:03 PM
Creation date
10/3/2017 9:14:37 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
1110
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC%ORKS PERMIT 41 Date: 6/;�J5116 <br /> City of Everett Public Works Department Public Works Permit#: PW1606-050 <br /> 3200 Cedar Street Parent Permit#: B1606-074 <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 12,112.28 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WILLIAMS INVESTMENTS I LLC <br /> 1020 W CASINO RD <br /> EVERETT WA 98204 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 29051700205500 SITE ADDRESS: 1110 BROADWAY <br /> SITE WORK FOR BLDG ADDITION AND RENOVATION <br /> ST ALSO LESS S 4FT <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 ff '; <br /> a, Com] <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 11/30/2016. <br /> 5. Keep City streets clean at all times. No dirt, mud, rocks, or debris th;be tr'bck onto 10., <br /> roadway. <br /> 6. Sidewalk, driveway and planting trees for landscape shall be City of Everett <br /> Standards. <br /> 7. Protect all existing underground utilities during construction. <br /> 8. Installation of the sidewalk along the project's street frontage will require adjustments :` 0 <br /> to and possible installation of conduits, junction boxes and wiring for the Gity's street • <br /> lighting and traffic signal systems. Consult with the City Traffic Engineerr�g;bepgrtment., X <br /> Steve Sawyer 425-257-7296 before beginning work that involves sidbw* alk `� <br /> 9. Contact the City of Everett Public Works Inspector Randy Allen at42 <br /> 3 :::74r�r",..,r. � v) 7 • <br /> to starting construction and with other inspection requests. i -' '-` T, i..21 <br /> C7)'7(. , <br /> n <br /> Public Works Permit Fee Breakdown: <br /> Parking Lot Paving(SQFT) $45.00 <br /> PW Plan Review $229.43 ai <br /> PW Site Inspection $458.85 <br /> Traffic M ation Fee $11,379 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages, costs,expenses,or <br /> l &,I,", causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> p o ed for Construc o Date remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> 1 /i3k <br /> FINAL INSPECTION Date <br /> Approved as Constructed Sigriature of A licant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AR1 THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> f vw.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.