Laserfiche WebLink
10/29/2019 Page 1 <br /> City of Everett <br /> 2:37:47PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1803-005 Site Address 1110 BROADWAY <br /> Applied 3/28/2018 Applicant KILBY RYAN Lot <br /> Approved 5/16/2018 Owner WILLIAMS INVESTMENTS I LLC Block <br /> Issued 5/16/2018 Contractor JKW GENERAL LLC Tract <br /> Parent Permit No. B1803-057 Description MECHANICAL/PLUMBING FIXTURES INCL HEAT PUMP ON <br /> Notes FOR COMMERCIAL TI <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 6/22/2018 6/22/2018 MECH 04-ROUGH SDP PARTIAL APPR <br /> IN <br /> 10/3/2018 10/3/2018 GAS 01-ROUGH IN SDP PARTIAL APPR 1.Pressure test is at 15#ok to hook up <br /> service. <br /> Note:The T and P drain line for the water <br /> heater will not pass final inspetion the <br /> fittings reduce the interval diameter of the <br /> pipe.Please correct before final inspecton. <br /> INSP12 YS TEM <br />