My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1705-90
>
Ordinances
>
Ordinance 1705-90
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2017 9:18:00 AM
Creation date
10/3/2017 9:17:58 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1705-90
Date
7/18/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. /,'4.5.-940 <br /> AN ORDINANCE creating a special fund entitled <br /> Fund 355, "19th Avenue S.E. and 110th Street S.E. <br /> Signal Reconstruction" to accumulate all costs <br /> for the Traffic Signal Reconstruction Project. <br /> WHEREAS, on March 16, 1990, the City of Everett entered into an agreement <br /> with the Washington State Department of Transportation to provide partial <br /> federal funding of preliminary engineering costs for design of Traffic Signal <br /> Reconstruction at the intersection of 19th Avenue S.E. and 110th Street S.E. <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN THAT: <br /> Section 1: A Special Fund is hereby established as Fund 355 entitled <br /> "19th Avenue S.E. and 110th Street S.E. Signal <br /> Reconstruction" to accumulate all costs for the traffic <br /> signal reconstruction. <br /> Section 2: Authorization is hereby given to accumulate costs and <br /> distribute payments from Fund 355, for the traffic signal <br /> reconstruction. <br /> Section 3: Authorization is hereby granted for the "Public Works <br /> Director," under the direction of the Mayor, to assume full <br /> and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this <br /> ordinance. <br /> Section 4: The sum of $14,200.00 is hereby appropriated to Fund 355, <br /> "19th Avenue S.E. and 110th Street S.E. Signal <br /> Reconstruction" as follows: <br /> A. Estimated Project Costs <br /> 1. Preliminary Engineering <br /> (Program 468) $14,200.00 <br /> TOTAL ESTIMATED COST $14,200.00 <br /> B. Source of Funds <br /> 1. Preliminary Engineering <br /> (Program 468) <br /> HES (Federal Aid) $12,150.00 <br /> 1/22 Gas Tax 2,050.00 <br /> TOTAL SOURCE OF FUNDS $14,200.00 <br /> C. This appropriation shall not lapse, but shall be carried <br /> forward from year to year until fully expended or the <br /> purpose has been accomplished or abandoned without the <br /> necessity of reappropriation as per R.C.W. 35.33.151. <br /> Section 5: The City Treasurer of the City of Everett is hereby <br /> authorized to negotiate a reasonable rate of interest and <br /> obtain temporary financing to satisfy interim construction <br /> costs. Temporary financing shall be redeemed as soon as <br /> reimbursement is received. <br />
The URL can be used to link to this page
Your browser does not support the video tag.