My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2615 BROADWAY QFC 2017-10-03
>
Address Records
>
BROADWAY
>
2615
>
QFC
>
2615 BROADWAY QFC 2017-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2017 10:26:17 AM
Creation date
10/3/2017 10:26:14 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2615
Tenant Name
QFC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> SECTION IV — SYSTEM DESIGN <br /> UL EX.3470 ULC CEx747 Page 4-45 <br /> 4-1-06 REV 3 <br /> ACTUATION AND EXPELLENT GAS LINE REQUIREMENTS <br /> (Continued) 2.A combined total of nine fittings may be used in these lines, <br /> Expellant Gas Line eight 90'elbows and one tee.Two 45°elbows equal one 90° <br /> 1.The expellant gas line piping is installed from the regulated elbow. <br /> release mechanism in double and multiple-tank systems, and 3.If two tanks are connected to the regulated release assembly <br /> from the regulated actuator assembly in multiple-tank sys- in a multiple-tank system arrangement, the total combined <br /> tems.The expellant gas line is the piping between the regula- length of the actuation and expellant gas lines must not <br /> for and the tank-enclosure/tank-bracket assembly. The total exceed 30 ft.(9 m) when using a"double-tank"nitrogen car- <br /> length of the expellant gas line from the regulated release tridge, an LT-A-101-30 nitrogen cartridge, or a 101-30 carbon <br /> mechanism or each regulated actuator assembly must not dioxide cartridge.See Figure 81. <br /> exceed 30 ft. (9 m) when using a"double-tank"cartridge, an <br /> LT-A-101-30 Cartridge,or a 101-30 Cartridge.See Figures 83 DISTRIBUTION PIPING REQUIREMENTS <br /> and 84. Once the nozzle placement and quantity of tanks has been deter- <br /> mined, it is then necessary to determine the piping configurations <br /> EXPELLANT GAS LINE between the tank adaptor and each discharge nozzle.This section <br /> MAXIMUM LENGTH-30 FT.(9 m). contains the guidelines and limitations for designing the distribu- <br /> tion piping so that the liquid agent will discharge from the nozzles <br /> at a proper flow rate.These limitations should also be referred to <br /> when selecting the mounting location for the regulated release <br /> mechanism and agent tank. <br /> General Piping Requirements <br /> 1.All R-102 system piping is straight line.Therefore,the need for <br /> critical lengths and balancing is minimized. <br /> 2 Two 45°elbows count as one 90°elbow. <br /> 3.Each branch line includes the tee or elbow leading to it, and <br /> "ANSUL AUTOMAN" all fittings within the branch line itself. <br /> REGULATED RELEASE 4.The minimum piping length of Schedule 40, 3/8 in.pipe from <br /> ASSEMBLY the tank outlet to any nozzle protecting a range,fryer, or wok <br /> must be 6 ft.(1.8 m). <br /> 5.Pipe lengths are measured from center of fitting to center of <br /> FIGURE 83 fitting.See Figure 85. <br /> 000776 <br /> CENTER TO CENTER <br /> EXPELLANT GAS LINE <br /> MAXIMUM LENGTH-30 FT.(9 m). <br /> MAXIMUM NO.OF FITTINGS-9 <br /> ' FIGURE 85 <br /> 000776 <br /> 6.All distribution piping must be 3/8 in. Schedule 40 black iron, <br /> chrome-plated,or stainless steel.Do not use hot dipped gal- <br /> vanized pipe on the distribution piping. <br /> 7. All threaded connections located in and above the protected <br /> area must be sealed with pipe tape.Tape should be applied to <br /> male threads only.Make certain tape does not extend over the <br /> end of the thread,as this could cause possible blockage of the <br /> agent distribution. <br /> 8. Before installing blow-off caps on nozzles, apply a small <br /> amount of Dow Corning No. 111 silicone grease across the <br /> opeing in the nozzle tip and also a small amount coating the <br /> REGULATED ACTUATOR <br /> ASSEMBLY exterior of the blow-off cap.This will help keep cooking grease <br /> FIGURE 84 from building up on the cap. <br /> 000777 ► 9. Tees used in the distribution piping can be used as thru tees, <br /> . side outlet tees, or bull tees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.