Laserfiche WebLink
PUBLIC VORICAPP AMENT MAILED MAS COPY <br /> Utilities Division,3200 Cedar Street <br /> 4M77- Everett WA 98201 <br /> 425-257-8800 <br /> • <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $16,013.00 Service Order# <br /> Contact Person Sheldon Kitts Telephone# 425 454-3621 <br /> Requested By Woodman Construction Date of Request 8/7/2015 <br /> Property Owner(name) Kevin & Rene Mulvaney <br /> Charge Cost to(name if different than owner) Attn: Sheldon Kitts/Woodman Construction <br /> Address 10910 117th PI NE Bldg 6 City Kirkland, Wa zip 98033 <br /> Installation Location 8407 Broadway <br /> Installation type/description/size/etc. 6" tap on 8" water main and connection to 6 " piped through <br /> vault and install 6" DCDA. See C.O.E. standard drawing #515. Please use Utility Vault 575 LA or <br /> equal (minimum size for clearance). <br /> ® The following estimate is based upon the Utilities Division providing all labor, equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $4902.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $3295.00 Matt Welborn <br /> Equipment Rental $1730.00 Randy Allen <br /> Paul McKee <br /> Tax $499.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration $5587.00 <br /> TOTAL $16,013.00 <br /> Prepared by: Jim Spooner Date Estimate Prepared 8/10/2015 <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\8407 Broadway CEFP <br /> 1of1 <br />