Laserfiche WebLink
ORDINANCE NO. 14057-g 9 <br /> AN ORDINANCE amending Ordinance #1438-88 entitled, "Laurel Drive Landslide <br /> Area" Fund to accumulate all the design, right-of-way and construction costs <br /> for the correction of the earth slide problem on Laurel Drive. <br /> WHEREAS on February 5, 1986, the Everett City Council authorized a <br /> geotechnical study to investigate the earthslide problem along Laurel Drive. <br /> WHEREAS on May 28, 1986, the Everett City Council conducted a public meeting <br /> to air the conclusions formed from the geotechnical study. <br /> WHEREAS on June 4, 1986 the Everett City Council conducted a public meeting at <br /> the landslide site to obtain firsthand knowledge of the slide area and the <br /> alternatives for the correction of the problem. <br /> WHEREAS on June 25 and July 9, 1986, the Everett City Council conducted a <br /> public hearing on the slide problem and recommended that a committee be formed <br /> to recommend corrective action. <br /> WHEREAS on October 1, 1986, the Everett City Council authorized thel <br /> expenditure of $30,000 for the closure of Laurel Drive to vehicular traffic. <br /> WHEREAS on February 18, 1987, the Everett City Council authorized a $3,500 <br /> project of reduced scope, as recommended by the Public Works Department, to <br /> correct several drainage and monumentation problems in the area. <br /> WHEREAS the neighborhood residents have agreed to pay $48,700.02 towards the <br /> construction of this project. As their payment will be on an installment <br /> basis such funds will not be available to the City for use during construction. <br /> WHEREAS on August 30, 1989 City Council authorized the award of the <br /> construction contract. <br /> NOW, THEREFORE BE IT ORDAINED BY THE EVERETT CITY COUNCIL THAT: <br /> Section 1. That Section 3 of Ordinance 1438-88 which reads as follows: <br /> Section 3: The total estimated cost of the improvement herein authorized! <br /> is $170,000 which shall include all costs related to the; <br /> design, construction contract administration, right-of-way and <br /> easements. <br /> IS HEREBY AMENDED AS FOLLOWS: <br /> Section 3: The total estimated cost of the improvement herein authorized <br /> is $204,904 which shall include all costs related to the <br /> design, construction contract administration, right-of-way and <br /> easements. <br /> I <br /> 6 <br />