Laserfiche WebLink
INSPECTION REPORT <br /> Date: �l0 �' Permit: E bV(. <br /> Contractor: VGG&l <br /> Owner: <br /> Site Address:_ �'G CC In o — <br /> TYPE OF INSPECTION REQUESTED <br /> ./ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> .--/,ELECTRICAL <br /> Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> oundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑GasPipeFinal ❑HWT Final <br /> OTHER OR CONSULTATION: 'tZ C., <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date. f Jia <br /> EIR(4/09) <br />