Laserfiche WebLink
Kirk Brooks <br /> From: Kirk Brooks <br /> Sent: Wednesday, August 10, 2016 3:46 PM <br /> To: Teresa Weldon; Paul McKee; Michael Brick;Jane Zimmerman;Jim Venturo <br /> Subject: Boeing Fuel Bladders <br /> I'm making up a Public Works permit for Dave Tyler. Below are the conditions I was contemplating for the permit. Please <br /> let me know if you want anything else for conditions or if you just want to chat about bladders. <br /> • Secondary spill containment must be provided via existing trenches and oil/water separator. (Oil holding <br /> capacity 55,700 Gal) <br /> • Install temporary perimeter fencing around the bladder/fueling site. <br /> • If bladders are transported with an oversize load consult with the City Traffic Engineering Department for route <br /> approval. <br /> Kirk Brooks <br /> City of Everett Public Works Department I Development Technician <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 <br /> Direct: 425-257-8814 <br /> Email: kbrooks(a)everettwa.gov <br /> All emails, and attachments, sent to and from City of Everett are public <br /> records and may be subject to public disclosure pursuant to RCW 42.56. <br /> 1 <br />