Laserfiche WebLink
PUBLIC WORKS DEPARTMENT <br /> 447r Utilities Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> • <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $2660.00 Service Order# <br /> Contact Person Dale Woodard Telephone# 425 508-3079 <br /> Requested By Kirk Brooks Date of Request 9-7-2016 <br /> Property Owner(name) Our Saviors Lutheran Church <br /> Charge Cost to(name if different than owner) Dale Woodard/Olympic General Contractors <br /> Address 2110 Madison St City Everett, WA Zip 98203 <br /> Installation Location 215 W Mukilteo Blvd <br /> Installation type/description/size/etc. 6" tap and install 6" gate vale for contractor installed <br /> fire service. Estimate is for contractor to excavate, shore and restore. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration, and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required instaRgAun <br /> date to allow for scheduling and parts procurement <br /> M F' <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,materialqujpimeat rental and <br /> administrative costs, the deficit shall be charged to the property for which such installaffbn W-s 140e and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applynggr._the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> 'Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK L .'.. AIME. M <br /> $1541.00 cc: Bldg. Permit Center —4 <br /> Material <br /> Mark Sadler <br /> Labor and Benefits $713.00 Matt Welborn <br /> Equipment Rental $279.00 Randy Allen <br /> Paul McKee <br /> Tax $127.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $2660.00 Benyam Stephanos <br /> Prepared by: Jim Po '' ate Estimate Prepared 9/22/2016 <br /> Accepted b presenting <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:A#CommonAclerical\Cost.est\2015\215 W Mukilteo Blvd CEFP <br /> lofl <br />