Laserfiche WebLink
CITY <br /> CERTIFICATE OF COMPLETION <br /> Project: Water Main Replacment Q - Broadway <br /> Contractor: Faber Construction Corporation <br /> Work Order No. UP 3612 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> Publi 1 orks Director Dat <br /> Dave Davis <br /> Approved by: <br /> / <br /> 10 ft xi <br /> Mayo if ity of E'erett D e <br /> Ray S -phan <br /> Attester i41/04 <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> im Iles, City Attorney <br /> Date <br /> '/94/7- <br />