My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CRITERION REQUIREMENT <br /> Sampling access:A sampling hatch of approximate 2 feet by 2 feet dimensions shall <br /> be included as part of the equipment access hatch,or separately, in order to access <br /> the clearwell influent for sampling. <br /> Center Baffle • Provide new hanging baffle to replace existing baffle. <br /> Curtain • Replace with material consistent with existing(e.g., Hypalon). <br /> • Install the baffle to the full plan view extent of the existing baffle,extending vertically <br /> from the floor to above the high water level for the clearwell. <br /> • Provide curtain baffle that can accommodate potential slosh wave forces without <br /> damaging baffle or requiring additional column strengthening while mitigating potential <br /> short-circuiting during normal operation. <br /> Wash-down • Replace the existing tank wash-down system within the clearwell with all new materials <br /> System suitable for submergence and exposure to chlorine. <br /> • Preserve the same number of outlet ports and discharge pressure, and ensure <br /> adequate support of the wash-down piping. <br /> 4.3.2 Screen House Bridge Replacement <br /> Design-Builder shall provide final design for connections to the existing screening building and to the <br /> existing abutment located on the reservoir dike, and install bridge accordingly. <br /> Owner is in process of procuring a pedestrian bridge that will replace the existing concrete Screen <br /> House Bridge. The Owner-furnished pedestrian bridge will be based on the conceptual design <br /> documents transmitted with the RFP(see Table 2.1). <br /> The pedestrian bridge assembly provided by the City will arrive in two pieces along with all parts and <br /> materials to connect both pieces. Design-Builder is required to assemble full span bridge, place <br /> bridge on current abutments and modify such abutments as necessary to accommodate the bridge. <br /> Design-Builder is also responsible for installing the concrete deck and steel reinforcement for the <br /> bridge deck surface. <br /> For purposes of construction planning,the approximate pick weight of the new bridge is 20,000 <br /> pounds.Verify the actual bridge weight based on the selected bridge supplier. <br /> The Vendor providing the apparent low price for supplying the prefabricated pedestrian bridge noted <br /> in these documents is Big R Bridge. <br /> The Vendor states delivery to be accomplished 75 calendar days after receipt of order. Owner <br /> anticipates issuing Notice of Award by August 11, 2017. <br /> The Vendor proposes to provide the following: <br /> 1. Bridge Model: Ped Truss-Parallel Chord - H Section FB <br /> 2. Length: 90 ft(out to out dimension) <br /> 3. Width: 5 ft (clear between rails) <br /> 4. Design Code: AASHTO LRFD Guide Specification Design Vehicle: 5000 lbs. <br /> 5. Live Load: 90 psf( LRFD) <br /> 6. Number of Pieces: 2 (field bolting by others) <br /> 7. Finish: Weathering-SP7 Clean <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.