My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jurisdiction over the Project or Site, the practices involved in the Project or Site, or any Work. <br /> 1.2.16 Owner's Project Criteria are as shown in the section entitled "Owner's Project Criteria," <br /> which is included in the Supplementary Conditions of Contact. <br /> 1.2.17 Site is the land or premises on which the Project is located. <br /> 1.2.18 Subcontractor is any person or entity retained by Design-Builder as an independent <br /> contractor to perform a portion of the Work and shall include materialmen and suppliers. <br /> 1.2.19 Sub-Subcontractor is any person or entity retained by a Subcontractor as an independent <br /> contractor to perform any portion of a Subcontractor's Work and shall include materialmen and <br /> suppliers. <br /> 1.2.20 Substantial Completion or Substantially Complete means the date on which the Work, or <br /> an agreed upon portion of the Work, is sufficiently complete in accordance with the Contract <br /> Documents so that Owner can occupy and use the Project or a portion thereof for its intended <br /> purposes. <br /> 1.2.21 Work is comprised of all Design-Builder's design, construction and other services <br /> required by the Contract Documents, including procuring and furnishing all materials, equipment, <br /> services and labor reasonably inferable from the Contract Documents. <br /> Article 2 <br /> Design-Builder's Services and Responsibilities <br /> 2.1 General Services <br /> 2.1.1 Design-Builder's Representative shall be reasonably available to Owner and shall have <br /> the necessary expertise and experience required to supervise the Work. Design-Builder's <br /> Representative shall communicate regularly with Owner and shall be vested with the authority to <br /> act on behalf of Design-Builder. Design-Builder's Representative may be replaced only with the <br /> mutual agreement of Owner and Design-Builder. <br /> 2.1.2 Design-Builder shall provide Owner with a monthly status report detailing the progress of <br /> the Work, including whether (i) the Work is proceeding according to schedule, (ii) discrepancies, <br /> conflicts, or ambiguities exist in the Contract Documents that require resolution, (iii) health and <br /> safety issues exist in connection with the Work; and (iv) other items that require resolution so as <br /> not to jeopardize Design-Builder's ability to complete the Work for the Contract Price and within <br /> the Contract Time(s). <br /> 2.1.3 Unless a schedule for the execution of the Work has been attached to the Contract as an <br /> exhibit at the time the Contract is executed, Design-Builder shall prepare and submit, at least <br /> three (3) days prior to the meeting contemplated by Section 2.1.4 hereof, a schedule for the <br /> execution of the Work for Owner's review and response. The schedule shall indicate the dates <br /> for the start and completion of the various stages of Work, including the dates when Owner <br /> information and approvals are required to enable Design-Builder to achieve the Contract Time(s). <br /> The schedule shall be revised as required by conditions and progress of the Work, but such <br /> revisions shall not relieve Design-Builder of its obligations to complete the Work within the <br /> Contract Time(s), as such dates may be adjusted in accordance with the Contract Documents. <br /> Owner's review of and response to the schedule shall not be construed as relieving Design- <br /> Builder of its complete and exclusive control over the means, methods, sequences and <br /> techniques for executing the Work. <br /> 2.1.4 The parties will meet within ten days after execution of the Contract to discuss issues <br /> affecting the administration of the Work and to implement the necessary procedures, including <br /> those relating to submittals and payment, to facilitate the ability of the parties to perform their <br /> East Clearwell Project General Conditions of Contract Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.