Laserfiche WebLink
c) If applicable, have: <br /> i. Industrial Insurance (workers' compensation) coverage for <br /> the subcontractor's employees working in Washington, as <br /> required in Title 51 RCW; <br /> ii. A Washington Employment Security Department number, <br /> as required in Title 50 RCW; <br /> iii. A Washington Department of Revenue state excise tax <br /> registration number, as required in Title 82 RCW; <br /> iv. An electrical contractor license, if required by Chapter 19.28 <br /> RCW; <br /> v. An elevator contractor license, if required by Chapter 70.87 <br /> RCW. <br /> d) Not be disqualified from bidding on any public works contract under <br /> RCW 39.06.010 or 39.12.065 (3). <br /> e) Reserved. <br /> 2.7.5 Design-Builder assumes responsibility to Owner for the proper performance of the Work <br /> of Subcontractors and any acts and omissions in connection with such performance. Nothing in <br /> the Contract Documents is intended or deemed to create any legal or contractual relationship <br /> between Owner and any Subcontractor or Sub-Subcontractor, including but not limited to any <br /> third-party beneficiary rights. <br /> 2.7.6 Design-Builder shall coordinate the activities of all Subcontractors. If Owner performs <br /> other work on the Project or at the Site with separate contractors under Owner's control, Design- <br /> Builder agrees to reasonably cooperate and coordinate its activities with those of such separate <br /> contractors so that the Project can be completed in an orderly and coordinated manner without <br /> unreasonable disruption. <br /> 2.7.7 Design-Builder shall keep the Site reasonably free from debris, trash and construction <br /> wastes to permit Design-Builder to perform its construction services efficiently, safely and without <br /> interfering with the use of adjacent land areas. Upon Substantial Completion of the Work, or a <br /> portion of the Work, Design-Builder shall remove all debris, trash, construction wastes, materials, <br /> equipment, machinery and tools arising from the Work or applicable portions thereof to permit <br /> Owner to occupy the Project or a portion of the Project for its intended use. <br /> 2.8 Design-Builder's Responsibility for Project Safety <br /> 2.8.1 Design-Builder recognizes the importance of performing the Work in a safe manner so as <br /> to prevent damage, injury or loss to (i) all individuals at the Site, whether working or visiting, (ii) <br /> the Work, including materials and equipment incorporated into the Work or stored on-Site or off- <br /> Site, and (iii) all other property at the Site or adjacent thereto. Design-Builder assumes <br /> responsibility for implementing and monitoring all safety precautions and programs related to the <br /> performance of the Work. Design-Builder shall, prior to commencing construction, designate a <br /> Safety Representative with the necessary qualifications and experience to supervise the <br /> implementation and monitoring of all safety precautions and programs related to the Work. <br /> Unless otherwise required by the Contract Documents, Design-Builder's Safety Representative <br /> shall be an individual stationed at the Site who may have responsibilities on the Project in <br /> addition to safety. The Safety Representative shall make routine daily inspections of the Site and <br /> shall hold weekly safety meetings with Design-Builder's personnel, Subcontractors and others as <br /> applicable. <br /> 2.8.2 Design-Builder and Subcontractors shall comply with all Legal Requirements relating to <br /> East Clearwell Project General Conditions of Contract Page 8 <br />