My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.11.2. Payment by Owner of any progress or final payment; <br /> 2.11.3. The issuance of a certificate of Substantial Completion by Owner or any payment <br /> related thereto by Owner; <br /> 2.11.4. Use or occupancy of the Work or any part thereof by Owner; <br /> 2.11.5. Any review and approval of a shop drawing or sample submittal or the issuance <br /> of a notice of acceptability by Owner; <br /> 2.11.6. Any inspection, test, or approval by Owner or others; or <br /> 2.11.7. Any correction of defective Work by Owner. <br /> Article 3 <br /> Owner's Services and Responsibilities <br /> 3.1 Duty to Cooperate <br /> 3.1.1 Except as otherwise provided in the Contract Documents, Owner shall, throughout the <br /> performance of the Work, reasonably cooperate with Design-Builder and perform its <br /> responsibilities, obligations and services in a timely manner to facilitate Design-Builder's timely <br /> and efficient performance of the Work and so as not to delay or interfere with Design-Builder's <br /> performance of its obligations under the Contract Documents. <br /> 3.1.2 Owner shall provide timely reviews and approvals of interim design submissions and <br /> Construction Documents consistent with the reasonable turnaround times set forth in Design- <br /> Builder's schedule. <br /> 3.2 Adjacent Land. Owner is responsible for securing and executing all necessary agreements with <br /> adjacent land or property owners that are necessary to enable Design-Builder to perform the <br /> Work. Owner is further responsible for all costs, including attorneys' fees, incurred in securing <br /> these necessary agreements. <br /> 3.3 Owner's Representative. Owner's Representative shall be responsible for providing Owner- <br /> supplied information and approvals in a timely manner to permit Design-Builder to fulfill its <br /> obligations under the Contract Documents. Owner's Representative shall endeavor to (but has <br /> no obligation to) provide Design-Builder with notice if it observes any failure on the part of Design- <br /> Builder to fulfill its contractual obligations, including any errors, omissions or defects in the <br /> performance of the Work. Owner's Representative shall communicate regularly with Design- <br /> Builder and shall be vested with the authority to act on behalf of Owner. <br /> 3.4 Owner's Separate Contractors. Owner is responsible for all work performed on the Project or <br /> at the Site by separate contractors under Owner's control. Owner shall require its separate <br /> contractors to cooperate with, and coordinate their activities so as not to interfere with, Design- <br /> Builder in order to enable Design-Builder to timely complete the Work consistent with the Contract <br /> Documents. <br /> Article 4 <br /> Hazardous Conditions and Differing Site Conditions <br /> 4.1 Hazardous Conditions <br /> 4.1.1 Unless shown or indicated in Contract Documents or identified in the Contract <br /> Documents to be within the scope of the Work, Design-Builder is not responsible for any <br /> Hazardous Conditions encountered at the Site. Upon encountering any Hazardous Conditions, <br /> Design-Builder will stop Work immediately in the affected area and duly notify Owner and, if <br /> required by Legal Requirements, all government or quasi-government entities with jurisdiction <br /> East Clearwell Project General Conditions of Contract Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.