My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to various work areas by the general public, Subcontractors, and other individuals will not <br /> be possible during certain hazardous materials work sequences, as specified in the <br /> Contract Documents. Design-Builder shall coordinate the Work to facilitate access by <br /> Subcontractors while enforcing work area restrictions, and shall minimize disruption to <br /> building occupants and services. <br /> 4.1.8.3 WORKING HOURS: No hazardous materials work shall occur when building <br /> users have access to work areas. Schedule all hazardous materials work to occur in <br /> accordance with schedule requirements outlined elsewhere in the Contract Documents, <br /> and when work areas have been vacated by building users. <br /> 4.1.8.4 EMERGENCY CONTACTS: Designated qualified representatives of the <br /> Contractor and specific hazardous materials Subcontractors are to be available on a 24- <br /> hour emergency basis for the duration of the Work. Provide contact information to the <br /> Owner's Representative for inclusion in the Project emergency contact list. <br /> 4.1.8.5 GENERAL HAZARDOUS MATERIALS SUBMITTALS: Contractor shall <br /> review the scope of work and submittal requirements outlined in the Contract Documents. <br /> The Contractor shall submit, and require all subcontractors performing the work of <br /> handling or disposing of any hazardous materials to submit, pertinent information <br /> required by the Contract Documents. Examples of work and impact may include <br /> abatement, demolition, saw cutting, roto-hammering, welding, sanding, drilling, scraping <br /> or other remodeling and metals-related impact, impact of asbestos-containing joint <br /> compound or other material with <1% asbestos, PCB ballast removal or light tube <br /> removal and disposal. <br /> 4.1.8.6 REGULATIONS, LAWS and ORDINANCES: The Contractor shall comply <br /> with all applicable regulations, laws and ordinances concerning the impact, removal, <br /> handling, storage, disposal, monitoring and protection against exposure or environmental <br /> pollution related to hazardous or regulated materials and conditions. Impacts to <br /> hazardous or regulated materials that may be required by the Work may include, but are <br /> not limited to: manual demolition, mechanical demolition, cutting, sawing, drilling, <br /> sanding, scraping, welding, power-washing or torch-cutting. Confirm required impacts <br /> with other applicable specification sections and drawing sheets. Contractor shall furnish <br /> all labor, materials, equipment, services and insurance that is specified, shown, or <br /> reasonably implied for the removal and handling of hazardous materials as part of the <br /> Work. <br /> 4.2 Differing Site Conditions <br /> 4.2.1 Differing Site Condition. If Design Builder encounters conditions at the Site which are <br /> subsurface or otherwise concealed physical conditions which differ materially from those <br /> indicated in the Contract Documents, or unknown physical conditions of an unusual nature which <br /> differ materially from those ordinarily found to exist and generally recognized as inherent in <br /> construction activities of the character provided for in the Contract Documents (collectively, a <br /> "Differing Site Condition"), then Design Builder shall give written notice to Owner within 24 hours <br /> after becoming aware of or having encountered such condition. Design-Builder shall not further <br /> disturb the Differing Site Condition or perform any Work in connection therewith (except for an <br /> emergency) until receipt of written order to do so. After receipt of such written notice, Owner will <br /> promptly review the pertinent condition. <br /> 4.2.2 Possible Contract Price and Contract Time Adjustments <br /> 4.2.2.1 If Design-Builder seeks to have the Contract Price or the Contract Time, or both, <br /> adjusted due to the existence of a Differing Site Condition, Design-Builder shall comply <br /> with the provisions of Article 9 in addition to the requirements of this Section 4.2. <br /> East Clearwell Project General Conditions of Contract Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.