My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents. If such Work is Substantially Complete, Owner shall prepare and issue a <br /> Certificate of Substantial Completion that will set forth (i)the date of Substantial Completion of the <br /> Work or portion thereof, (ii) the remaining items of Work that have to be completed before final <br /> payment, (iii) provisions (to the extent not already provided in the Contract Documents) <br /> establishing Owner's and Design-Builder's responsibility for the Project's security, maintenance, <br /> utilities and insurance pending final payment and (iv) an acknowledgment that warranties <br /> commence to run on the date of Substantial Completion, except as may otherwise be noted in the <br /> Certificate of Substantial Completion or the Contract Documents. <br /> 6.6.2 Reserved. <br /> 6.6.3 Owner, at its option, may use a portion of the Work which has been determined to be <br /> Substantially Complete, provided, however, that (i) a Certificate of Substantial Completion has <br /> been issued for the portion of Work addressing the items set forth in Section 6.6.1 above, (ii) <br /> Design-Builder and Owner have obtained the consent of their sureties and insurers, and to the <br /> extent applicable, the appropriate government authorities having jurisdiction over the Project, and <br /> (iii) unless otherwise provided in the Contract Documents, Owner and Design-Builder agree that <br /> Owner's use or occupancy will not interfere with Design-Builder's completion of the remaining <br /> Work. <br /> 6.7 Final Payment <br /> 6.7.1 After receipt of a Final Application for Payment from Design-Builder, Owner shall make <br /> final payment by the time required in the Contract, provided that Design-Builder has achieved <br /> Final Completion. <br /> 6.7.2 At the time of submission of its Final Application for Payment, Design-Builder shall <br /> provide the following information: <br /> 6.7.2.1 an affidavit that there are no claims, obligations or liens outstanding or <br /> unsatisfied for labor, services, material, equipment, taxes or other items performed, <br /> furnished or incurred for or in connection with the Work which will in any way affect <br /> Owner's interests; <br /> 6.7.2.2 a general release executed by Design-Builder in a form acceptable to Owner <br /> waiving, upon receipt of final payment by Design-Builder, all claims, except those claims <br /> previously made in writing to Owner and remaining unsettled at the time of final payment; <br /> 6.7.2.3 if requested by Owner, consent of Design-Builder's surety, if any, to final <br /> payment; <br /> 6.7.2.4 all operating manuals, warranties and other deliverables required by the Contract <br /> Documents; <br /> 6.7.2.5 certificates of insurance confirming that required coverages will remain in effect <br /> consistent with the requirements of the Contract Documents; <br /> 6.7.2.6 certified payrolls from the Contractor and all Subcontractors, <br /> 6.7.2.7 "Statement of Intent to Pay Prevailing Wages and Affidavit of Wages Paid" from <br /> Contractor and each Subcontractor filed with the Owner and the Department of Labor <br /> and Industries, <br /> 6.7.2.8 Certification of Use or Deferred Sales Tax Paid or both, and <br /> 6.7.2.9 if required by the Owner, other data establishing payment or satisfaction of <br /> obligations, including, but not limited to, receipts, releases and waivers of liens, claims, <br /> security interests or encumbrances arising out of the Contract, to the extent and in such <br /> East Clearwell Project General Conditions of Contract Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.