My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
change to Contract Price, covering all costs associated with the requested Change <br /> Order; (b) specific request for change in Contract Time (number of days); and (c) all <br /> documentation supporting the Request for a Change Order, including but not limited to all <br /> cost records, schedule analysis, and the documents identified in the Contract <br /> Documents, that are in any way relevant to the Design-Builder's Request for Change <br /> Order. <br /> 9.1.3.3 Pending resolution of Design-Builder's Request for a Change Order, Design- <br /> Builder shall continue to perform all Work including, at the written request of the Owner, <br /> the work associated with the pending Request for Change Order. <br /> 9.1.3.4 A Request for Change order that is not accepted by Owner within 30 days after <br /> receipt by Owner is deemed denied. <br /> 9.1.3.5 If Design-Builder disagrees with denial of a Request for Change Order, the <br /> Design-Builder's sole remedy shall be to file a fully documented Claim in accordance with <br /> Article 10 within 30 days after Design-Builder's receipt of the denial or within thirty (30) <br /> days after the denial is deemed to have occurred under Section 9.1.3.4 above. <br /> 9.1.4 Unilateral Change Order. Owner may unilaterally issue a Change Order at any time, <br /> without invalidating the Contract and without notice to sureties. If any such Change Order <br /> causes an increase or decrease in the cost of, or time required for, performance of any part of the <br /> Work, Owner may make an adjustment in the Contract Price, Contract Time, or both, in <br /> accordance with the Contract Documents. If Design-Builder disagrees with the adjustment to the <br /> Contract Price or Contract Time as indicated in a Unilateral Change Order, Design-Builder's only <br /> remedy shall be to file a fully documented Claim in accordance with Article 10. Regardless of any <br /> such disagreement, the Design-Builder is required to continue with performance of all Work, <br /> including work associated with the Unilateral Change Order. <br /> 9.1.5 Owner Change Order Proposal. Change requests may be initiated by Owner through a <br /> Change Order Proposal submitted to Design-Builder. Such a request is for information and <br /> pricing only, and is not an instruction to execute changes or to stop work in progress, unless <br /> issued as a Work Change Directive. Upon receipt of the Owner Change Order Proposal, the <br /> Design-Builder shall promptly submit its proposed costs and pricing. If Owner and Design-Builder <br /> agree to the terms of the cost and pricing for the proposed change, they shall execute a mutually <br /> acceptable Change Order to authorize the change. <br /> 9.2 Work Change Directives <br /> 9.2.1 A Work Change Directive is a written order prepared and signed by Owner, directing a <br /> change in the Work prior to agreement on an adjustment in the Contract Price and/or the Contract <br /> Time(s). <br /> 9.2.2 Owner and Design-Builder shall negotiate in good faith and as expeditiously as possible <br /> the appropriate adjustments for the Work Change Directive. Upon reaching an agreement, the <br /> parties shall prepare and execute an appropriate Change Order reflecting the terms of the <br /> agreement. <br /> 9.3 Minor Changes in the Work. Minor changes in the Work do not involve an adjustment in the <br /> Contract Price and/or Contract Time(s) and do not materially and adversely affect the Work, <br /> including the design, quality, performance and workmanship required by the Contract Documents. <br /> Design-Builder may make minor changes in the Work consistent with the intent of the Contract <br /> Documents, provided, however that Design-Builder shall promptly inform Owner, in writing, of any <br /> such changes and record such changes on the documents maintained by Design-Builder. <br /> East Clearwell Project General Conditions of Contract Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.