My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoEngineers Inc 10/9/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
GeoEngineers Inc 10/9/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2017 11:03:10 AM
Creation date
10/10/2017 11:03:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoEngineers Inc
Approval Date
10/9/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Grant Moen
Subject / Project Title
7400 Block Lowell Larimer Road Stabilization
Public Works WO Number
PW3685 10 14
Tracking Number
0000887
Total Compensation
$36,167.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services to City of Everett <br /> September 25, 2017 <br /> Page 3 <br /> CITY OF EVERETT RESPONSIBILITIES <br /> • City will provide site access and will provide the necessary permits and right of way access to <br /> complete the field explorations without a fee. <br /> • City will provide base map survey of the site and as-built drawings/construction records of the existing <br /> utilities in the project vicinity. <br /> • City will identify all known underground utilities within the right-of-way along the project alignment <br /> prior to performing the drilling services. <br /> • City will provide all traffic control services needed for our drilling services within the road right-of-way. <br /> ■ City will dispose of drill cuttings generated from the explorations. <br /> ASSUMPTIONS <br /> • This initial scope and fee estimate does not include the following services: <br /> • surveying; <br /> • environmental characterization/testing, or disposal of impacted or contaminated waste soil <br /> generated during drilling; <br /> • shoring design; <br /> • dewatering design; and <br /> • during construction observation. <br /> • The explorations will be located in the field by pacing or tape measurement from existing site <br /> features. Using these techniques, the locations of the explorations will be established for <br /> presentation on a site plan. We recommend that the boring locations be surveyed for vertical and <br /> horizontal control as part of the project. <br /> • It is assumed that the driller will leave on site clean (non-impacted, non-contaminated) spoils <br /> generated during drilling for disposal by the City. This scope and fee estimate does not include <br /> environmental characterization/testing, or disposal of impacted or contaminated waste soil <br /> generated during drilling. <br /> DELIVERABLES <br /> ■ Interim Action Recommendation Letter <br /> • Draft and Final Geotechnical Engineering Report <br /> GeoEngineers,Inc. <br /> File No.0661-113-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.