Laserfiche WebLink
SEE SCHEDULE ON <br /> SHEET S9 FOR STUD <br /> EDGE NAILING (TYP.) SIZE & SPACING EDGE NAILING (TYP.) <br /> SHEATH PER ARCH. <br /> 3 4" "GYPCRETE" ON CONN. ® SILL: SOCHEDULEER HEARWALL(SEE PLANS dCONN. ® SILL: <br /> 3 4" T & G PLYWOOD 16d U.N.O. FOR SHEARWALL IN SCHE <br /> � IN SHEARWALL <br /> SCHEDULE LOCATIONS) <br /> CONT, TJI <br /> BLKG. TO TOP 1E <br /> CONN: <br /> 16d ® 12"0/c U.N.O. <br /> IN SHEARWALL <br /> SCHEDULE y 2 X 6 FRAMING PER <br /> SHEATH PER ARCH. SIMPSON JB26 HGR. <br /> TJI's PER PLAN <br /> OR PER SHEARWALL TJI PER PLAN � TJI's PER PLAN <br /> SCHEDULE (SEE PLANS TJI BLKG. ® 48"% <br /> " FOR SHEARWALL TJI BLKG. TIGHT BTWN. BLKG. TO TOP � COP <br /> SOLID TJI BLKG. ® 48o/c LOCATIONS) JOISTS 16d ® 12"% U.N.O. <br /> IN END BAY IN SHEARWALL SCHE <br /> 1 ALIGN STUDS UNDER FRAMING SEE SCHEDULE ON <br /> SHEET S9 FOR STUD <br /> SIZE & SPACING s <br /> i <br /> . N -A -7 SECTION. B-7 SECTION C - 7 <br /> 3/4" =1'-0" 3/4" =1'-O" 3/4" e1'-O" <br /> • C <br /> J <br />