Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: fl Lac )- 120 <br /> Contractor: <br /> s — Owner: Seo Cb �( &0 <br /> Site Address: L I?2 Cbyjlj p st <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> 'Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final El Gas PipeFinal ❑HWT Final <br /> "�1 <br /> OTHER OR CONSULTATION: G— Z qy – q �Q C) 1pa `.l <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> OK FOR C.O. ❑ VIOLATION <br /> UNABLE TO PERFORM INSPECTION: <br /> CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: 6 <br /> EIR(4/09) RE F(RMS K N()M()rIUNS•-1/488-8900 <br />