Laserfiche WebLink
INSPECTION REPORT <br /> Date: <br /> Date: CD b Permit: (.0�y ` <br /> Contractor: �)(Aha,(4 'ED-eC- <br /> r Y ' Owner: _ <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑ OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> eiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final <br /> � E:1 Gas <br /> �Pipe Final ElHWT Final <br /> /f <br /> OTHER OR CONSULTATION: ✓�' L 1 7' I —L 131P <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P RMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4/09) iL�l/17e-�. <br />