Laserfiche WebLink
INSPECTION REPORT f1l" <br /> Q <br /> Date: I- I- I tO Permit: E 'CO O� — <br /> Contractor: ' ko-&kv( CV()A�t F,I?-('_t`( 0u <br /> f Owner: <br /> Site Address: I D�.Q <�,If b-0 Ul`_0Q. -1 1 N <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ,L;J�un m ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> C <br /> in rid ❑Drywall Nailing ❑ Plumbing Final <br /> tricalFin I ❑Shear Nailing GAS PIPE <br /> WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> rains El Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THI <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4/09) X--Q Lk , <br />