Laserfiche WebLink
Technical Information Report <br />1031 SE Everett Mall Way <br />Everett, WA 98028 <br />1 certify that this technical information report and all attachments were prepared <br />either by me or my technical staff working directly under my supervision. <br />REVISIONS <br />March 27, 2017 <br />Original Submission <br />April 12, 2017 <br />1" Revision <br />TABLE OF CONTENTS <br />MR 1 - PREPARATION OF STORWATER SITE PLAN..............................................................................................2 <br />PROJECTOVERVIEW...........................................................................................................................................2 <br />SITEINFORMATION.............................................................................................................................................2 <br />SOILSINFORMATION..........................................................................................................................................2 <br />EXISTINGCONDITIONS.......................................................................................................................................4 <br />DESIGNSTANDARDS...........................................................................................................................................4 <br />MR2-SWPPP NARRATIVE.................................................................................................................................6 <br />CONSTRUCTION SEQUENCE AND PROCEDURE....................................................................................................6 <br />TRAPPINGSEDIMENT..........................................................................................................................................7 <br />MR3 - SOURCE CONTROL OF POLLUTION...........................................................................................................7 <br />MR4 - PRESERVATION OF NATURAL DRAINAGE SYSTEMS & OUTFALLS..........................................................7 <br />MRS-ON-SITE STORM WATER MANAGEMENT..................................................................................................7 <br />Appendices <br />• Soil Map <br />• Civil Plan Set <br />