My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1031 SE EVERETT MALL WAY MODERN DENTISTRY 2022-03-07
>
Address Records
>
SE EVERETT MALL WAY
>
1031
>
MODERN DENTISTRY
>
1031 SE EVERETT MALL WAY MODERN DENTISTRY 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:38:07 PM
Creation date
10/18/2017 11:40:01 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1031
Tenant Name
MODERN DENTISTRY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />Everett Dental Office - TIR <br />April 2017 <br />Trapping Sediment <br />Structural control measures will be used to reduce erosion and retain sediment on the <br />construction site. The control measures will be selected to fit specific site and seasonal <br />conditions. <br />The following items will be used to control erosion and sedimentation processes: <br />• Temporary gravel construction entrance <br />• Filter fabric fences (Silt fences) <br />• Ground cover measures such as straw cover and/or hydroseeding <br />• Inlet protection <br />Vehicle tracking of mud off -site shall be avoided. Installation of a gravel construction <br />entrance will be installed at a location to enter the site. The entrances are a minimum <br />requirement and may be supplemented if tracking of mud onto public streets becomes <br />excessive. <br />MR3 — SOURCE CONTROL OF POLLUTION <br />BMPs for mobile fueling of vehicles and heavy equipment and for concrete handling is <br />included in the SWPPP, provided for this project under a separate cover. <br />MR4 — PRESERVATION OF NATURAL DRAINAGE SYSTEMS & OUTFALLS <br />Existing drainage patterns and a detailed topographic survey indicate that the southern <br />portion of the site discharges runoff southwesterly into the public storm main located on <br />SE Everett Mall Way. Drainage patterns in the developed condition will continue to <br />discharge to SE Everett Mall Way, maintain the natural drainage system and outfalls. No <br />adverse impacts are anticipated as a result of the proposed Project improvements. <br />MR5 — ON -SITE STORM WATER MANAGEMENT <br />Non -roof Hard Surfaces <br />Minimum Requirement #5 requires the Project to implement one of the followng BMP's, <br />if feasible. <br />• Full Dispersion in accordance with BMP T5.30: <br />Full dispersion is not feasible because there are no native vegetative flow path for <br />to meet BMP T5.30 design criteria. <br />• Infiltration BMP's: <br />The site proposes 3,318 SF of permeable pavement for on -site stormwater <br />management of the parking lot area. <br />Soil Management Plan for Lawn/Landscape Surfaces <br />Within the limits of site disturbance, duff and topsoil will be retained in an undisturbed <br />The Concept Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.