My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 9/2/2017
>
Contracts
>
Capital Contract
>
Stellar J Corporation 9/2/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 9:40:29 AM
Creation date
10/19/2017 10:04:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
9/2/2017
Council Approval Date
8/9/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Portal 1 Replacement
Public Works WO Number
UP3602
Tracking Number
0000888
Total Compensation
$765,372.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 7/9/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A7- <br /> CITY <br /> l2CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> ITEM ---i� 1 CONTRACT <br /> I DESCRIPTION IJNIT NO. T'RICE <br /> EASE BID LS $01P,.1pgtl t <br /> TRENCH SAFETY SYSTEMS �� _.__.. <br /> 2' LS $DEPTHS OVER 4 FEET 1 <br /> 2. Washington State Sales Tai,;tip9.7% lD`1)1P <br /> 3. TOTAL Em <br /> 1.3 ACCEPTANCE <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid closing date. <br /> B. If this Bid is accepted by the Ownerwithin the time period stated above,we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> 2. Furnish the required 100% payment and 100% performance bonds within 14 calendar <br /> days of receipt of Notice of Award in the form described in Supplementary Conditions. <br /> 3. Commence Work within seven calendar days after receipt of Notice to Proceed. <br /> C. If this Bid is accepted within the indicated time, and we fail to commence the Work or we fail to <br /> provide the required bonds, the Bid security shall be forfeited as damages to the Owner by <br /> reason of our failure, limited in amount to the lesser of the face value of the Bid security or the <br /> difference between this Bid and the Bid upon which Contract is signed. <br /> D. In the event our Bid is not accepted within the time stated above,the required Bid security will <br /> be returned to the undersigned,according tO the provisions of the Instructions to Bidders, unless <br /> a mutually satisfactory arrangement is made for its retention and validity for a an extended period. <br /> of time. <br /> I <br /> 1.4 CONTRACT TIME <br /> A. If this Bid is accepted,we Will: ' <br /> 1. Begin work immediately after receiving Owner's letter of Notice to Proceed and to reach <br /> Substantial Completion within the dates required under the Contract Documents. <br /> 2, Agree to pay liquidated damages to the City as stated in the Contract (Document 00 60 , <br /> 13) in.the event the project is not completed on or before required time periods. <br /> 3, Contract with the Owner using the Contract form provided herewith, on the terms and <br /> conditions contained herein, to do everything necessary for to complete the construction <br /> of the project within the allotted time. <br /> I <br /> Portal 1 Replacement June 2017 <br /> WO#UP3602 00 41 13 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.